Loading...
HomeMy WebLinkAbout2021_PWTour2021 Public Works Projects Tour PUBLIC WORKS 2021 PROJECTS TOUR </a:t></a: </a:t></a:Virtual Project Highlights 84th AVE NE Overlay – NE 12th Street to Overlake Drive West Multi-Phase Project Partnering and Coordinating with TIB, COB & KC Phase 1 Curb Ramps - completed Phase 2 AC watermain replacement – Early Summer 2021 Phase 3 Asphalt Overlay – Late Summer PHASE 1 PHASE 1 PHASE 1 PHASE 2 PHASE 2 PHASE 2 PHASE 2 PHASE 2 PHASE 3 PHASE 3 NE 12th Street Sidewalk Improvements West of Indian Trail Crossing Currently 3.5’ wide sidewalk with power poles Non-Compliant per ADA Standards Install new 6’ wide sidewalk Install curb bulb-outs around poles Install Bicycle Sharrow Lane Reduce travel lane widths Existing Conditions Non-Compliant Driveway Aprons Wide lanes encourage speeding Current Configuration NE 12th STREET - PROPOSED DESIGN Proposed Configuration Medina Park Playground Improvements Replace outdated equipment More inclusive playground (ages & abilities) Move Sand Pit out of the main area Proposed Design (version 2) Featured Center Piece New Swings for All And something for the little ones Who doesn’t like Monkey Bars? Fairweather Tennis Court Resurfacing East Tennis Court Surface is older and weathered West Tennis Court was done last year Post Office Floor Replacement Worn and dated flooring Subfloor issues