Loading...
HomeMy WebLinkAboutTraffic Calming PresentationMedina Traffic Calming Phase 1 June 2021 Medina Park Parking Lot Digital Speed Signs Speed Limit Pavement Markings Additional Speed Limit Signs -,�- a- ... &L � r � 9 Before the Fix Digital Speed Signs – 1.W/B 24th west of 84th 2.E/B NE 24th between 79th and 80th 3.E/B NE 12th in the center island at 8500 block 4.W/B NE 12th across from Medina Park W/B west of 84th E/B between 79th & 80th E/B east of 84th W/B across from Medina Park MPH 25 E/B NE 12th east of EPR MPH 25 W/B NE 12th west of Medina Park MPH 25 W/B Overlake Drive Pavement Locations: 1. W/B OLD E entering the City 2. E/B OLD W just before 84th 3. 84th just south of the 5-way 4. W/B NE 12th near the park at the base of the hill 5. E/B 12th near 7800 block 6. W/B NE 24th between 82nd and 80th 7.E/B NE 24th near 78th 8.N/B EPR just north of NE 12th 9.S/B EPR near 22nd 10.N/B EPR north of 24th 11.S/B EPR south of NE 28th Addition Speed Limit Signs Evergreen Point Road NE 24th Overlake Drive Digital Signs – Each sign -$19,790 Overall cost for purchase and installation -$89,077 Speed Limit Pavement Markings Each marking -$550 Eleven markings = $6,050 Additional Speed Limit Signs Ten Signs -$85/sign = $850 Mobile Speed Measuring Survey Device -$6,000 Approximate Total Cost -$101,977 REET -“Road Improvement Project for Traffic Safety” REET Funds available –no impact to any other projects SPEED LIMIT 25 1) Duf!stic SPEED LIMIT 25 ol MvEDINA � WASH INC:1'ON