Loading...
HomeMy WebLinkAboutResolution No. 125CITY OF MEDINA, WASHINGTON Resolution No. 125 A REBUZUTION adopting a comprehensive Street Program for the six year period comaucing WHEREAS, the City is by Section2 of Chapter 195, Laws of 1961 re- quired to prepare and adopt a comprehensive Street program for the six years ensuing after January 1, 1975 and file the same, with the Director of Highways: and - WHEREAS, a Public Hearing upon such.a;Ar5oposeplan y}was had before the City Council of the City of Medina, on June 9,-'1�75, where all interested persons were given opportunity to present their views on such proposed plan. Now, therefore, TEE CITY COUNCIL OF THE CITY OF HEDINA DOES RESOLVE AS FOLLONS: SECTION 1. SIX YEAR STREET IMPROVEMENT ADOPTED The following program of Street Improvement is hereby approved and adopted by the City of Medina: 1976 82nd. Ave. NE from HE 24th St. to and along $37,000 HE 27th St. to 80th Ave. NE. Work contemplat- ed includes subgrade and base repair estimated at 10% of total street surface, minimal correct- ions to roadside drainage, and an asphalt con- crete overlay. 2976 78th Ave. NE from NE 24th St. to HE 28th St. and 39,000 WE 28th St. from 77th Ave. NE to Both Ave. NE. Work contemplated includes base repair and An asphalt concrete overlay. 2977 78th Pl. WE from HE 32nd St. to Evergreen Pt. Rd. 36,000 Work contemplated includes subgrade and base re- pair estimated at 10% of total street surface, cor- rections to roadside drainage, and an asphalt con - crate overlay. 1978 79th Ave. and NE 21st St. south of HE 22nd St. 40,000 Work contemplated includes repair of an estimat- ed 20% of the subgrade and base and an asphalt concrete overlay. 1979 NE 14th St. from Evergreen Pt. Rd. to 80th Ave. NE 26,000 Work contemplated includes repair of an estimated 20% of the subgrade and base, drainage corrections, and an asphalt concrete overlay. 1979 Evergreen Pt. Rd. from NE 8th St. south. Work con- I1,500 templated includes repair of existing concrete and overlaying with asphalt concrete. 1980 77th Ave. NE from NE 17th St. to HE 20th St. 65,000 Work contemplated includes major base and sub - grade repair, drainage corrections including under - drains, and an asphalt concrete overlay. 2981 Overlake Dr. E from 84th Ave. NE to HE lake Wash. 115,000 Blvd. Work contemplated includes base and sub - grade repair, miscellaneous drainage corrections, and an asphalt concrete overlay including prelevel- ing. SECTION 2. Filing. The City Clerk is hereby instructed to file an authenticated copy of this resolution with the Director of Highways no more than thirty days after adoption of this Resolution. THIS RESOLUTION adopted the 9th day of June 1975. ATTEST: Glo a J. Dobl '\— Edward Watton, Mayor