Loading...
HomeMy WebLinkAboutResolution No. 127CITY OF MEDINA, WASHINGTON Resolution No. bft /a-7 A RESOLUTION adopting a comprehensive Street Program for the six year period commencing January 1, 1976. WHEREAS, the City is by Section 2 of Chapter 195, Laws of 1961 required to prepare and adopt a comprehensive Street Program for the six years ensuing after January 1, 1976 and file the same with the Director of Highways; and WHEREAS, a Public Hearing upon such a proposed plan was had before the City Council of the City of Medina, on June 14, 1976, where all interest- ed persons were given opportunity to present their views on such proposed plan. Now, therefore, THE CITY COUNCIL OF THE CITY OF MEDINA DOES RESOLVE AS FOLLOWS: SECTION 1. SIX YEAR STREET IMPROVEMENT ADOPTED The following program of Street Improvement is hereby approved and adopted by the City of Medina: 1976 82nd. Ave. ME from NE 24th St. to and.along $.34,000 WE 27th St. to 80th Ave. NE. Work contemplat- ad includes subgrade and base repair estimated , at 10% of total street surface, minimal correct- ions to roadside drainage, and an asphalt con- crete overlay. 1976 Overlake Dr. E from 84th Ave. NE to HE Lake Wash. 100,000 Blvd. Work contemplated includes base and sub - grade repair, miscellaneous drainage corrections., , and an asphalt concrete overlay including prelevel- ing. 1977 77th Ave. NE from NE 17th St. to NE 20th St. 51,000 Work contemplated includes major base and sub - grade repair, drainage corrections including under - drains, and an asphalt concrete overlay. 1978 79th Ave. and NE 21st St. south of NE 22nd St. 36,500 Work contemplated includes repair of an estimat- ed 20% of the subgrade and base and an asphalt concrete overlay. 1981 78th Ave. NE from NE 24th St. to NE 28th St. and 36,000, HE 28th St. from 77th Ave. HE to 80th Ave. NE. Work contemplated includes base repair and an asphalt concrete overlay. 1980 78th Pl. NE from NE 32nd St. to Evergreen Pt. Rd. 44,000 Work contemplated includes subgrade and base re- pair estimated at 10% of total street surface, cor- rections to roadside drainage, and an asphalt con- crete overlay. 1979 HE 14th St. from Evergreen It. Rd. to 80th Ave. NE 29,000 Work contemplated includes repair of an estimated 20% of the subgrade and base, drainage corrections, and an asphalt concrete overlay. 1982 Evergreen Pt. Rd. from HE 8th St. south. Work con- 18,500 templated includes repair of existing concrete and overlaying with asphalt concrete.