Loading...
HomeMy WebLinkAboutResolution No. 133CITY OF MEDINA, WASHINGTON Resolution No. 133 A RESOLUTION adopting a comprehensive Street Program for the six year period Commencing January 1, 1977. WHEREAS, the City is by Section 2 of Chapter 195, Laws of 1961 required to Prepare and adopt a comprehensive Street Program for the six years ensuing after January 1, 1977 and file the same with the Director of Highways; and WHEREAS, a Public Hearing upon such a proposed plan was had before the City Council of the City of Medina, on June 13, 1977, where all interested persons bare given opportunity to present their views on such proposed plan. Wow, therefore, THE CITY COUNCIL OF THE CITY OF MEDINA DOES RESOLVE AS FOLLOWS: SECTION 1. SIR YEAR STREET IMPROVEMENT ADOPTED The following program of Street Improvement is hereby approved and adopted by the City of Medina: 1977 Overlake Dr. E. from 64th Ave. N.E. to N.E. Lake Washington $100,000 Blvd. Work contemplated includes base and sub -grade repair, miscellaneous drainage corrections, and an asphalt concrete overlay including preleveling. . 1978 78th P1. N.E. from N.E. 32nd St. to Evergreen Point Road. 44,000 Work contemplated includes sub -grade and base repair es- timated at 10% of total street surface, corrections to road- side drainage, and an asphalt concrete overlay. 1979 77th Ave. N.E. from N.E. 17th St. to N.E. 20th-St. Work con- 51,000 templated includes major base and sub -grade repair, drainage corrections including under -drains, and an asphalt concrete overlay. 1980 79th Ave. N.E. and N.E. 21st St. south of N.E. 22nd St. Work 36,500 contemplated includesrepairof an estimated 20% of the tub - grade and base and an asphalt concrete overlay. 1981 78th Ave. N.E. from N.E. 24th St. to N.E. 28th St. and 36,000 N.E. 28th St. from 77th Ave. N.E. to 80th Ave. N.E. Work contemplated includes base repair and an asphalt concrete overlay. 1982 N.E. 14th St, from Evergreen Point Road to 80th Ave. N.E. 29,000 Work contemplated includes repair of an, estimated 20E of the sub-oxade,pnd. base, drainage. corrections, and an asphalt con- crete overlay. 1983 Evergreen Point Road from N.E. eth St. south. Work contem- 18,500 plated includes repair of existing concrete and overlaying with asphalt concrete. SECTION 2. Filing. The City Clerk is hereby instructed to file an authenticated Copy of this resolution with the Director of Highways no more thirty daysa£ter adopt'on•of than <.this Resolution. THIS RESOLUTION ADOPTED THE 13th day of J�" i Y*.M) MY, R m:h :"4w 6 vto V,d, 40 ATTEST: .. AH)T14il - �LCQ_i .. ioria Baker I n.. chid. b City Cl rk - ♦esb4"Al W e4144 ,w{i Mr N pdbw z. tmnr,¢ �4h n•i+:<+1p 41. e'ebd sswi» .V19 erd pM 1pad a.WR