Loading...
HomeMy WebLinkAboutResolution No. 139CITY OF MEDINA, WASHINGTON Resolution No. 139 A RESOLUTION adopting a Revised Comprehensive Street Program for the six year period commending January 1, 1978. WHEREAS, the City is by Section 2 of Chapter 195, Laws of 1961 required to prepare and adopt a comprehensive Street Program for the six years 1978-1983 and file the same with the Director of Highways; and WHEREAS, a Public Hearing upon the revised proposed plan was had before the City Council of the City of Medina on June 12, 1978, where all interested persons were given opportunity to present their views on such proposed plan. Now, therefore, THE CITY COUNCIL OF THE CITY OF MEDINA DOES RESOLVE AS FOLLOWS: SECTION 1. SIX YEAR STREET IMPROVEMENT ADOPTED The following program of Street Improvement is hereby approved and adopted by the City of Medina: 1978 Overlake Dr. E. from 84th Ave. N.E. to N.E. Lake Washington $170,000.00 Blvd. Work contemplated includes base and sub -grade repair, miscellaneous drainage corrections, and an asphalt concrete overlay including preleveling. 1978 N.E. 14th St. from Evergreen Point Road to 80th Ave. N.E. $ 42,000.00 Work contemplated includes repair of. an -estimated ?OX of the sub -grade and base, drainage corrections; and an asphalt - concrete overlay. 1979 78th P1. N.E. from N.E. 32nd St. to Evergreen Point Road. $ 44,000.00 Work contemplated includes sub -grade and base repair estimated at 10% of total street surface, corrections to roadside drain- age, and an asphalt concrete overlay. 1980 77th Ave. N.E. from N.E. 17th to N.E. 20th St. Work con- $ 51,000.00 templated includes major base and sub -grade repair, drainage corrections including under -drains, and an asphalt concrete overlay. 1981 79th Ave. N.E. and N.E. 21st St. south of N.E. 22nd St. Work $ 36,500.00 contemplated includes repair of an estimated 20% of the sub - grade and base and an asphalt concrete overlay. 1982 78th Ave. N.E. from N.E. 24th St. to N.E. 28th St. and N.E. $ 36,000.00 28th St. from 77th Ave. N.E. to 80th Ave. N.E. Work con- templated includes base repair and an asphalt concrete overlay. 1983 Evergreen Point Road from N.E. 8th St. south. Work contemplated $ 18,500.00 includes repair of existing concrete and overlaying with asphalt concrete. SECTION 2. •FILING. The City Clerk is hereby instructed to file an authenticated copy of this resolution with the Director of Highways no more than thirty days after adoption of this Resolution. THIS RESOLUTION ADOPTED THE 12th day of June, 1978. Zia 44&_ 'JCZ4&C ATTEST: Mayo __­Pe06A=zinger Acting City Manager