Loading...
HomeMy WebLinkAboutResolution No. 145'CITY Of MEDINA, WASHINGTON Resolution No. 145 A RESOLUTION adopting a Comprehensive Six Year Street Plan. WHEREAS, the City is by Section 2 of Chapter 195, Laws of 1961 required to prepare and adopt a comprehensive Street Program for the six years 1979- 1985 and file the same with the Director of Highways; and WHEREAS, a Public Hearing upon the revised proposed plan was heard before the City Council of the City of Medina on May 14, 1979, where all interested persons were given opportunity to present their views on such proposed plan. Now, therefore, THE CITY COUNCIL OF THE CITY OF MEDINA DOES RESOLVE AS FOLLOWS: SECTION 1. SIX YEAR STREET IMPROVEMENT ADOPTED The following program of Street Improvement is hereby approved and adopted by the City of Medina: 1979 Overlake Dr. E. from 84th Ave. N.E. to N.E. Lake Washington $200,000.00 Blvd. Work contemplated includes base and sub -grade repair, miscellaneous drainage corrections, and an asphalt concrete overlay including preleveling. N.E. 24th St. between 82nd Ave. N.E. and 84th Ave. N.E. $50,000.00 Work contemplated includes sub -grade and base repair esti- mated at 20X of the total street, drainage correctiona and as asphalt concrete overlay. 1980 78th P1. N.E. from N.E. 32nd St. to gvergreen Point Road. $75,000.00 Work contemplated includes sub -grade and base repair estimated at 20% of total street surface, correction to roadside drain- age, and an asphalt concrete overlay. 1981 78th Ave. N.E. and 79th Ave. N.E. south of N.E. 22nd St. and $909000.00 N.E. 21st St. Work contemplated includes repair of an esti- mated 30% of the sub -grade and base and an asphalt concrete overlay (originally scheduled for 1980). 1982 81st Ave. N.E. between N.E. 7th St. and N.E. 8th St. Work $10,000.00 contemplated includes base repair estimated at 20X of total street surface and an asphalt concrete overlay. N.E. loth St. and 84th Ave. N.S. (Intersection). Work con- $5,000.00 templated includes base repair and an asphalt concrete over- lay. N.E. 18th St. between Evergreen Pt. Rd. and Rambling Lane. $5,000.00 Work contemplated includes base repair and an asphalt con- crete overlay. 1983 78th Ave. N.E. from N.E. 24th St. to N.E. 28th St. and N.E. $51,000.00 28th St. from 77th Ave. N.E. to 80th Ave. N.E. Work con- templated includes base repair and an asphalt concrete overlay. 1984 N.E. 7th St. and 84th Ave. N.E. (Intersection). Work contem- $5.000.00 plated includes base repair and an asphalt concrete overlay. Evergreen Pt. Rd. from N.E. 8th St. south. Work contem- $26,000.00 plated includes repair of existing concrete and overlaying With asphalt concrete. Page Two i 1985 80th Ave. N.E. between N.E. 26th St. and N.E. 24th St. $30,000.00 Work contemplated includes base repair of approximately 15% of street surface and asphalt concrete overlay. N.E. 22nd St. east of 79th Ave. N.E. Work contemplated $6,000.00 consists of base repair of approximately 20% of the street surface and an asphalt concrete overlay. N.E. 32nd St. between 78th PL N.E. and 80th Ave. N.E. $5,000.00 Work contemplated includes sub -grade and base repair and resurfacing of three crossings of the roadway. SECTION 2. FILING. The City Clerk is hereby instructed to file an authenticated copy of this resolution with the Director of Highways no more than thlry days after adoption of this Resolution. THIS RESOLUTION ADOPTED THE llth day of June, 1979. Mayor ATTEST: i Peg�j VJ YH na nger City Clerk