Loading...
HomeMy WebLinkAboutResolution No. 152CITY OF MEDINA, WASHINGTON Resolution No. 152 A RESOLUTION adopting a Comprehensive Six Year Street Plan. WHEREAS, the City is by Section 2 of Chapter 195, Laws of 1961 required to prepare and adopt a comprehensive Street Program for the six years 1980-1986 and file the same with the Director of Highways; and WHEREAS, a Public Hearing upon the revised proposed plan was heard before the City Council of the City of Medina on June 9, 1980, where all interested persons were given opportunity to present their views on such proposed plan. Now, therefore, THE CITY COUNCIL OF THE CITY OF MEDINA DOES RESOLVE AS FOLLOWS: SECTION 1. SIX YEAR STREET IMPROVEMENT ADOPTED The following program of Street Improvement is hereby approved and adopted by the City of Medina: 1980 78th P1. N.E. from N.E. 32nd St. to Evergreen Point Road. $ 90,000.00 Work contemplated includes sub -grade and base repair est- imated at 20% of total street surface, correction to road- side drainage, and an asphalt concrete overlay. 1981 Overlake Dr. E. from 84th N.E. to N.E. Lake Washington 300,000.00 Blvd. Work contemplated includes base and sub -grade repair, miscellaneous drainage corrections, and an asphalt concrete overlay including preleveling. 78th Ave. N.E. and 79th Ave. N.E. south of N.E. 22nd St. 108,000.00 and N.E. 21st St. Work contemplated includes repair of'an estimated 30% of the sub -grade and base and an asphalt con- crete overlay. 1982 81st Ave. N.E. between N.E. 7th St. and N.E. 8th St. Work 12,000.00 contemplated includes base repair estimated at 20% of total street surface and an asphalt concrete overlay. N.E. 10th St. and 84th Ave. N.E. (Intersection). Work con- 6,000.00 templated includes -base repair and an asphalt concrete overlay. N.E. 18th St. between Evergreen Point Road and Rambling Lane. 6,000.00 Work contemplated includes base repair and an asphalt con- crete overlay. 1983 78th Ave. N.E. from N.E. 24th St. to N.E. 28th St, and N.E. 60,000.00 28th St. from 77th Ave. N.E. to 80th Ave. N.E. Work con- templated includes base repair and an asphalt concrete over- lay. 1984 N.E. 7th St. and 84th Ave. N.E. (Intersection). Work contem- 6,000.00 plated includes base repair and an asphalt concrete overlay. Evergreen Pt. Rd. from N.E. 8th St. south. Work contemplated 31.000.00 includes repair of existing concrete and overlaying with as- phalt concrete. 1985 80th Ave. N.E. between N.E. 26th St. and N.E. 24th St. 44,000.00 Work contemplated includes correction of roadside drainage, base repair of approximately 25% of street surface and as- phalt concrete overlay. Page Two 1986 N.E. 22nd St. east of 79th Ave. N.E. Work contemplated $ 7,500.00 consists of base repair of approximately 20% of the street surface and an asphalt concrete overlay. N.E. 32nd St. between 78th Pl. N.E. and 80th Ave. N.E. 6,000.00 Work contemplated includes sub -grade and base repair and resurfacing of three crossings of the roadway. 77th Ave. N.E. at N.E. 14th St. Work contemplated in- 8,000.00 cludes correction to roadside drainage, base repair, and an asphalt concrete overlay. SECTION 2. FILING. The City Clerk is hereby instructed to file an authenticated copy of this resolution with the Director of Highways no more than thirty days after adoption of this Resolution. THIS RESOLUTION ADOPTED THE 9th day of June, 1980. ��`C7.�1�1f•C� VJISCI'r'� Mayor ATTEST: Hu Peggy HunzTngerer City Clerk 1 ?Ci,__Y" /hereby ce�lilY that 1 am the City Clark of tf Medina; that annexed hereto is nr. ru,nnr. N......... ------- ENTITLED: p �'C✓...��.:.ol'�'�" ....._ -- ...._�.....�--tip... ---- --..._.----- ___ - --- -.- being the true and correct copy of such orci:.noca w'.•.idt was Gub:hhed an ,posted according to the laws of the state of third c.as, 'cities beginning live days or more b 's efiedivo date. ISFTe,,