HomeMy WebLinkAboutResolution No. 321CITY OF MEDINA
RESOLUTION NO. 321
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MEDINA,
WASHINGTON, ADOPTING A SCHEDULE OF FEES.
THE CITY COUNCIL OF THE CITY OF MEDINA, WASHINGTON, does
adopt the following findings of fact:
1. The fees currently charged by the City are consistent with current
costs of administration, but some changes in the official fee
schedule are necessary to be consistent with city codes and
practices.
2. The attached schedule of fees has been established to recover
the actual costs of providing the services described in the
schedule.
Based on the findings of fact set forth above, THE CITY COUNCIL OF
THE CITY OF MEDINA, WASHINGTON, does resolve as follows:
RESOLVED that the schedule of fees attached hereto as Exhibit A is
adopted, effective immediately.
PASSED BY THE CITY COUNCIL IN REGULAR OPEN MEETING ON
THIS 81h DAY OF JANUARY, 2007.
Miles R. Adam, Mayor
Approved as to form:
WayneT aka, City Attorney
Attest:
Rac el Baker, City Clerk
CITY OF MEDINA
2007 FEE SCHEDULE
Fee Tvae I Amount I MIMIC Section
Code Violation Penalties $100.00 per violation first day; Section 1.15.020
$200.00 per violation 2"d day;
$300.00 per violation 3rd day;
$400.00 per violation 4th day;
$500.00 per violation each add1
day after 41h day.
Accident reports/incident
reports
Accident Reports $4.50
Incident Reports $7.50
Section 2.48.030 (A)
Audio Duplications
$15.00 per tape or CD
Section 2.48.030 A
Computer printout, set up
fee
$25.00
Section 2.48.030 (A)
Computer printout,
additional per page cost
Each page $0.15
Section 2.48.030 (A)
Copies, color
Each page $0.50
Section 2.48.030 A
Copies, black & white
81/2 X 11 Each page $0.15
11 X 17 Each page $0.20
Section 2.48.030 (A)
Maps — color 18 X 38
$45.00
Section 2.48.030 A
Maps — b & w 18 X 38
$12.00
Section 2.48.030 A
Ordinances, Resolutions &
Notices of Decision
First copy free; all others $0.15 per
page
Section 2.48.030 (A)
Construction Blueprints
$5.00, plus actual printing costs
Section 2.48.030 (A)
(copies)
Hearing Examiner Fee 1 $1,000.00 1 Section 2.78.120
Finaerorintina 1 $6.00 Der set I Section 3.64.010
Witness Fee $10.00 per day, plus Section 4.01.100
mileage in the amount set
by RCW 43.03.060. Expert
witnesses may be paid in
excess of this amount only
upon prior agreement
between the City and the
Expert Witness.
Juror Service Fee $10.00 per day, plus Section 4.01.110
mileage in the amount set
by RCW 43.03.060
Case Filing $31.00 per case Section 4.01.120
1 /18/2007 1
Fee Type
Amount
MMC Section
Transcript of Judgment
$6.00 per judgment
Section 4.01.120
Certifying any document on
$5.00 per document, plus
Section 4.01.120
file
$0.10 per page for copies
Preparing the record of a
$40.00 per case, plus
Section 4.01.120
case for appeal to Superior
Superior Court Filing Fee
Court
Duplication of part or all of
$10.00 per tape
Section 4.01.120
the electronic tape of a
proceeding
Probation Fee
$50.00 per month
Section 4.01.120
Stop Payment Fee for
$25.00 per check
Section 4.01.120
Court Issued Checks
Non -Sufficient Funds Fee
$25.00 per check
Section 4.01.120
for Returned Checks
Vehicle Impound Hearing
$31.00 per case
Section 4.01.120
Fee
Proof of Insurance
$25.00 per case
Section 4.01.120
Card/Administrative
Dismissal
Electronic Home Detention
$25.00 set-up, plus $105.00
Section 4.01.120
per week, unless another
amount is set by Court
order
Work Release
$25.00 set-up, plus $20.00
Section 4.01.120
per day, unless another
amount is set by Court
order
Day Detention
$10.00 per day, unless
Section 4.01.120
another amount is set by
Court order
Failure to Respond
$25.00 for parking cases
Section 4.01.120
$52.00 for infraction cases
Business License
$150.00
Section 5.04.020
Cable Franchise
Negotiated with Franchisee
Section 5.08.060
1 /18/2007
Fee Tvpe I Amount I MIMIC Section
Animal Impound Fee
$30.00 1" & 2"° impound;
Section 6.04.030
$50.00 3rd impound;
$200.00 4th or subsequent
in a year, plus $5.00 per
24-hour period.
Dog License — Annual
$10.00
Section 6.04.040
spayed/neutered
$7.00 Senior Citizen
Dog License —Annual
$20.00
Section 6.04.040
unspayed/unneutered
$15.00 Senior Citizen
Dog License — Lifetime
$30.00
Section 6.04.040
spayed/neutered
$20.00 Senior Citizen
Dog License — Lifetime
$60.00
Section 6.04.040
unspayed/unnueutered
$40.00 Senior Citizen
Cat License — Annual
$7.00
Section 6.04.040
spayed/neutered
$5.00 Senior Citizen
Cat License — Annual
$12.00
Section 6.04.040
unspayed/unneutered
$10.00 Senior Citizen
Cat License — Lifetime
$20.00
Section 6.04.040
spayed/neutered
$12.00 Senior Citizen
Cat License — Lifetime un-
$36.00
Section 6.04.040
spayed/un-neutered
$25.00 Senior Citizen
Replacement Tag
$2.00
Section 6.04.040
Late Renewal Fee 15.00 1 Section 6.04.040
Home Security System No charge Section 8.12.030
Registration
False Alarm Response Fee
1" response — Free
Section 8.12.030
2"d response - $50.00
3rd response - $100.00
4th response - $150.00
51h response - $200.00
6th & subseq - $250.00
1/18/2007 3
Oversized Vehicle Permit
$500.00
Section 10.72.010
Overweight Vehicle Permit
$500.00
Section 10.72.010
Tracked, spiked, cleated,
lugged vehicle permit
$750.00
Section 10.72.020
Construction Vehicle
Parking Permit
No charge
Section 10.72.030
Street Excavation/Trench $250.00 non-refundable, Section 12.06.020
Cut Permit plus cost for City inspectors Section 12.08.060
based on hourly rate
(wages & benefits) of the
employee(s) involved
Right-of-way Use Permit $150.00 —off paved surface Section 12.08.010
$250.00 — on paved surface
ROW Tree Trimming or $50.00, plus consultant Section 12.28
Removal Permit I fees
Tree Mitigation Permit — $500.00, plus consultant Section 12.28
During Development fees
Tree Mitigation Permit No Fee Section 12.28
Not During Development
Garage Sale Permit I No charge I Section 12.36.010
1 /18/2007 4
M
Blanket Utility Permit $500.00, plus consultant Section 13.12.040
fees
Lot Line Adjustment $375.00, plus consultant & Section 14.04.010
recording fees
Substantial Development $850.00, plus consultant Section 14.04.010
Permit fees
Administrative Decision $500.00, plus consultant Section 14.04.070
Appeal Fee fees
Administrative Review $500.00
Permit
Section 14.08.010
Building Permit Attachment A Section 15.04.030
Building Permit Extension $150.00, plus actual cost of Section 15.04.040
inspections
Mechanical Permit Attachment B Section 15.04.010
1 /18/2007 5
Fee Schedule Authority is delegated to the Section 17.44.030
city manager to increase or
decrease fees for
development permits to
reflect, as closely as
possible, the actual cost to
the city of processing
development permits;
provided that the city
manager must submit any
proposed modification to
the city council, at its
regular meeting, not less
than 45 days prior to the
effective date of said
modifications and the
council may reject any
proposed modifications.
Accessory Dwelling Unit
Registration Fee
Special Use Permit —
Satellite Receiving System
Sign Permit
$175.00, plus consulting
fees
$100.00
100.00
Section 17.50.040 (E)
Section 17.52.060 (B)
Section 17.80.100 (B)
1/18/2007 6
I i i i
Sign Impound Fee 1 $25.00 1 Section 17.80.140
Critical Areas Alteration
Permit
$50.00, plus consultant
costs
Section 18.12
Other
Concealed Weapon Permit
$60.00 Original
$32.00 Renewal
$42.00 Late Renewal
RCW 9.41.070
Reconsideration
$500.00
Reroof
$175.00
Comprehensive Plan
Amendment Fee
$4,000.00
Permit Replacement
$100.00
Zoning Ordinance
Amendment
$4,000.00
1 /18/2007 7
TABLE A — BUILDING PERMIT FEES
TOTAL VALUATION
FEE
$1.00 TO $500.00
$25.00
$501.00 TO $2,000.00
$25.00 for the first $500.00, plus $3.20 for each additional $1,000.00,
or fraction thereof, to and including $2,000.00.
$2,001.00 TO $25,000.00
$73.00 for the first $2,000.00 plus $14.75 for each additional
$1,000.00 or fraction thereof, to and including $25,000.00.
$25,001.00 TO $50,000.00
$412.25 for the first $25,000.00 plus $11.00 for each additional
$1,000.00 or fraction thereof, to and including $50,000.00.
$50,001.00 TO $100,000.00
$687.25 for the first $50,000.00 plus $7.50 for each additional
$1,000.00 or fraction thereof, to and including $100,000.00.
$100,001.00 TO $500,000.00
$1,062.25 for the first $100,000.00 plus $6.00 for each additional
$1,000.00 or fraction thereof, to and including $500,000.00.
$500,001.00 TO $1,000,000.00
$3,462.25 for the first $500,000.00 plus $5.00 for each additional
$1,000.00 or fraction thereof, to and including $1,000,000.00.
$1,000,001.00 AND UP
$5,962.25 for the first $1,000,000.00 plus $3.35 for each additional
$1,000.00 or fraction thereof.
DEMOLITION OF AN EXISTING BUILDING ....... :....................................... $100.00 PLUS
CONSULTANT COSTS
RELOCATION OF A BUILDING/MOVE A BUILDING INTO THE CITY.. ..... ..... $250.00
INITIAL PLAN REVIEW .......................................... ................................ 65% OF PERMIT FEE
ADDITIONAL REVIEW OF CORRECTIONS, REVISIONS, ADDITIONS .......... CONSULTANT COSTS
REVIEW OF DEFERRED ITEMS.............................................................CONSULTANT COSTS
ONE INSPECTION & ONE RE -INSPECTION .............................................INCLUDED IN PERMIT FEE
ADDITIONAL RE -INSPECTIONS FOR COMPLIANCE.................................CONSULTANT COSTS
WORK NOT READY FOR INSPECTION WHEN SCHEDULED......................CONSULTANT COSTS
INSPECTIONS FOR WHICH NO FEE IS SPECIFIED..................................CONSULTANT COSTS
WORK STARTED WITHOUT A PERMIT...................................................FEE IN AMOUNT OF
PERMIT FEE, BUT NOT
LESS THAN $100.00
1 /18/2007
TABLE B - MECHANICAL PERMIT FEES
Permit Issuance
1. For the issuance of each mechanical permit......................................................................................................$25.00
2. For issuing each supplemental permit for which the original permit has not expired, been canceled, or finaled .........................7.60
Unit Fee Schedule
1. Furnaces
For the installation or relocation of each forced -air or gravity type furnace or burner, including ducts and vents attached to such
appliance, up to an including 100,000 Btu/h (29.3 kW).........................................................................................15.50
For the installation or relocation of each forced -air or gravity type furnace or burner, including ducts and vents attached to such
appliance, over 100,000 Btu/h (29.3 kW)..........................................................................................................19.10
For the installation or relocation of each floor furnace, including vent........................................................................15.50
For the installation or relocation of each suspended heater, recessed wall heater or floor -mounted unit heater .........................15.50
2. Appliance Vents
For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit................7.60
3. Repairs or Additions
For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating,
cooling, absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code.............14.50
4. Boilers, Compressors and Absorption Systems
For the installation or relocation of each boiler or compressor to and including three horsepower (10.6 kW), or each absorption
system to and including 100,000 Btu/h (29.3 kW..................................................................................................15.50
For the installation or relocation of each boiler or compressor over three horsepower (10.6 kW), to and including fifteen horsepower
(52.7 kW), or each absorption system over 100,000 Btu/h (29.3 kW) to and including 500,000 Btu/h (146.6 kW).....................28.50
For the installation or relocation of each boiler or compressor over fifteen horsepower (52.7 kW) to and including thirty horsepower
(105.5 kW), or each absorption system over 500,000 Btu/h (146.6 kW) to and including 1,000,000 Btu/h (293.1 kW)...............39.10
For the installation or relocation of each boiler or compressor over thirty horsepower (105.5 kW) to and including fifty horsepower
(176 kW), or each absorption system over 100,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW)..................58.20
For the installation or relocation of each boiler or compressor over fifty horsepower (176 kW), or each absorption system over
1,750,000 Btu/h (512.9 kW)..........................................................................................................................97.30
5. Air Handlers
For each air -handling unit to and including 10,000 cubic feet per minute (cfin) (4719 Ls), including ducts attached thereto ......... 11.20
Note: This fee does not apply to an air -handling unit which is a portion of a factory -assembled appliance, cooling unit, evaporative
cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code.
For each air -handling unit over 10,000 cfin (4719 Us)............................................................................................19.00
6. Evaporative Coolers
For each evaporative cooler other than portable type.............................................................................................11.20
7. Ventilation and Exhaust
For each ventilation fan connected to a single duct.................................................................................................7.60
For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit ..................11.20
For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood............................11.20
8. Incinerators
For the installation or relocation of each domestic -type incinerator.............................................................................19.10
For the installation or relocation of each commercial or industrial -type incinerator..........................................................25.50
9. Miscellaneous
For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other appliance categories, or for
Which no other fee is listed in this table............................................................................................................11.20
For all gas piping system fees see King County Health Department fee schedule.
10. For permits requiring a mechanical plan review, permit fees shall be determined by valuation and calculated using Table A.
11. Plan Review, Initial...........................................................................................................25% OF PERMIT FEE
12. Additional review of corrections, revisions, or additions............................................................CONSULTANT COSTS
13. Review of deferred items...................................................................................................CONSULTANT COSTS
14. One inspection & one re-inspection.......................................................................................Included in Permit Fees
15. Additional re -Inspections for compliance...............................................................................CONSULTANT COSTS
16. Work not ready for inspection when scheduled........................................................................CONSULTANT COSTS
17. Inspections for which no fee is specified.................................................................................CONSULTANT COSTS
TABLE C — GRADING PERMIT
TOTALYARDS
FEE
25 TO 100 YARDS
$100.00
101 TO 500 YARDS
$100.00 for the first 100 yards plus $10.00 for each additional
25 yards, or fraction thereof, to and including 500 yards.
501 TO 1,000 YARDS
$260.00 for the first 500 yards plus $12.00 for each additional
25 yards, or fraction thereof, to and including 1,000 yards.
1,001 TO 2,000 YARDS
$500.00 for the first 1,000 yards plus $13.00 for each additional
25 yards, or fraction thereof, to and including 2,000 yards.
2,001 YARDS AND UP
$1,020.00 for the first 2,000 yards plus $13.50 for each
additional 25 yards, or fraction thereof.
PLAN REVIEW.......................................................................CONSULTANT COSTS
ONE INSPECTION & ONE RE-INSPECTION...............................INCLUDED IN PERMIT FEE
ADDITIONAL INSPECTIONS FOR COMPLIANCE........................CONSULTANT COSTS
TESC AND DRAINAGE SYSTEM PLAN REVIEW.........................CONSULTANT COSTS
SEASONAL TESC/EROSION CONTROL INSPECTIONS ...............CONSULTANT COSTS
INSPECTIONS FOR WHICH NO FEE IS SPECIFIED .....................CONSULTANT COSTS
Note: Up to 50 cubic Yards of excavation, necessary for a basement or crawlspace, are exempt
from fee calculation.
Notes on 2007 Fee Schedule
1..This fee schedule has no dollar value changes from 2006
2. Changes incorporated are editorial or reference only
a. Page 4 Chap 12.28, The work Mitigation is used in place of Removal and the
reference is change to Section 12.28 to be compatible with our tree ordinance
b. Page 4, Chap 12.28, A clarification is added to show that no charge is required
for a Tree Mitigation Permit not occurring during development
c. Page 7, Chap 17.94, Historical Use Permits are added under Reclassificaion of
Zoning District
d. Site Plan Review Fee now has a chapter reference to 14.12 and will be moved
there in the final document
e. Table A — Building Permit Fees, A note is added clarifying that up to 50 yards of
excavation are exempt from the calculation
No other changes have been made to the 2006 Fee Schedule