Loading...
HomeMy WebLinkAboutResolution No. 321CITY OF MEDINA RESOLUTION NO. 321 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MEDINA, WASHINGTON, ADOPTING A SCHEDULE OF FEES. THE CITY COUNCIL OF THE CITY OF MEDINA, WASHINGTON, does adopt the following findings of fact: 1. The fees currently charged by the City are consistent with current costs of administration, but some changes in the official fee schedule are necessary to be consistent with city codes and practices. 2. The attached schedule of fees has been established to recover the actual costs of providing the services described in the schedule. Based on the findings of fact set forth above, THE CITY COUNCIL OF THE CITY OF MEDINA, WASHINGTON, does resolve as follows: RESOLVED that the schedule of fees attached hereto as Exhibit A is adopted, effective immediately. PASSED BY THE CITY COUNCIL IN REGULAR OPEN MEETING ON THIS 81h DAY OF JANUARY, 2007. Miles R. Adam, Mayor Approved as to form: WayneT aka, City Attorney Attest: Rac el Baker, City Clerk CITY OF MEDINA 2007 FEE SCHEDULE Fee Tvae I Amount I MIMIC Section Code Violation Penalties $100.00 per violation first day; Section 1.15.020 $200.00 per violation 2"d day; $300.00 per violation 3rd day; $400.00 per violation 4th day; $500.00 per violation each add1 day after 41h day. Accident reports/incident reports Accident Reports $4.50 Incident Reports $7.50 Section 2.48.030 (A) Audio Duplications $15.00 per tape or CD Section 2.48.030 A Computer printout, set up fee $25.00 Section 2.48.030 (A) Computer printout, additional per page cost Each page $0.15 Section 2.48.030 (A) Copies, color Each page $0.50 Section 2.48.030 A Copies, black & white 81/2 X 11 Each page $0.15 11 X 17 Each page $0.20 Section 2.48.030 (A) Maps — color 18 X 38 $45.00 Section 2.48.030 A Maps — b & w 18 X 38 $12.00 Section 2.48.030 A Ordinances, Resolutions & Notices of Decision First copy free; all others $0.15 per page Section 2.48.030 (A) Construction Blueprints $5.00, plus actual printing costs Section 2.48.030 (A) (copies) Hearing Examiner Fee 1 $1,000.00 1 Section 2.78.120 Finaerorintina 1 $6.00 Der set I Section 3.64.010 Witness Fee $10.00 per day, plus Section 4.01.100 mileage in the amount set by RCW 43.03.060. Expert witnesses may be paid in excess of this amount only upon prior agreement between the City and the Expert Witness. Juror Service Fee $10.00 per day, plus Section 4.01.110 mileage in the amount set by RCW 43.03.060 Case Filing $31.00 per case Section 4.01.120 1 /18/2007 1 Fee Type Amount MMC Section Transcript of Judgment $6.00 per judgment Section 4.01.120 Certifying any document on $5.00 per document, plus Section 4.01.120 file $0.10 per page for copies Preparing the record of a $40.00 per case, plus Section 4.01.120 case for appeal to Superior Superior Court Filing Fee Court Duplication of part or all of $10.00 per tape Section 4.01.120 the electronic tape of a proceeding Probation Fee $50.00 per month Section 4.01.120 Stop Payment Fee for $25.00 per check Section 4.01.120 Court Issued Checks Non -Sufficient Funds Fee $25.00 per check Section 4.01.120 for Returned Checks Vehicle Impound Hearing $31.00 per case Section 4.01.120 Fee Proof of Insurance $25.00 per case Section 4.01.120 Card/Administrative Dismissal Electronic Home Detention $25.00 set-up, plus $105.00 Section 4.01.120 per week, unless another amount is set by Court order Work Release $25.00 set-up, plus $20.00 Section 4.01.120 per day, unless another amount is set by Court order Day Detention $10.00 per day, unless Section 4.01.120 another amount is set by Court order Failure to Respond $25.00 for parking cases Section 4.01.120 $52.00 for infraction cases Business License $150.00 Section 5.04.020 Cable Franchise Negotiated with Franchisee Section 5.08.060 1 /18/2007 Fee Tvpe I Amount I MIMIC Section Animal Impound Fee $30.00 1" & 2"° impound; Section 6.04.030 $50.00 3rd impound; $200.00 4th or subsequent in a year, plus $5.00 per 24-hour period. Dog License — Annual $10.00 Section 6.04.040 spayed/neutered $7.00 Senior Citizen Dog License —Annual $20.00 Section 6.04.040 unspayed/unneutered $15.00 Senior Citizen Dog License — Lifetime $30.00 Section 6.04.040 spayed/neutered $20.00 Senior Citizen Dog License — Lifetime $60.00 Section 6.04.040 unspayed/unnueutered $40.00 Senior Citizen Cat License — Annual $7.00 Section 6.04.040 spayed/neutered $5.00 Senior Citizen Cat License — Annual $12.00 Section 6.04.040 unspayed/unneutered $10.00 Senior Citizen Cat License — Lifetime $20.00 Section 6.04.040 spayed/neutered $12.00 Senior Citizen Cat License — Lifetime un- $36.00 Section 6.04.040 spayed/un-neutered $25.00 Senior Citizen Replacement Tag $2.00 Section 6.04.040 Late Renewal Fee 15.00 1 Section 6.04.040 Home Security System No charge Section 8.12.030 Registration False Alarm Response Fee 1" response — Free Section 8.12.030 2"d response - $50.00 3rd response - $100.00 4th response - $150.00 51h response - $200.00 6th & subseq - $250.00 1/18/2007 3 Oversized Vehicle Permit $500.00 Section 10.72.010 Overweight Vehicle Permit $500.00 Section 10.72.010 Tracked, spiked, cleated, lugged vehicle permit $750.00 Section 10.72.020 Construction Vehicle Parking Permit No charge Section 10.72.030 Street Excavation/Trench $250.00 non-refundable, Section 12.06.020 Cut Permit plus cost for City inspectors Section 12.08.060 based on hourly rate (wages & benefits) of the employee(s) involved Right-of-way Use Permit $150.00 —off paved surface Section 12.08.010 $250.00 — on paved surface ROW Tree Trimming or $50.00, plus consultant Section 12.28 Removal Permit I fees Tree Mitigation Permit — $500.00, plus consultant Section 12.28 During Development fees Tree Mitigation Permit No Fee Section 12.28 Not During Development Garage Sale Permit I No charge I Section 12.36.010 1 /18/2007 4 M Blanket Utility Permit $500.00, plus consultant Section 13.12.040 fees Lot Line Adjustment $375.00, plus consultant & Section 14.04.010 recording fees Substantial Development $850.00, plus consultant Section 14.04.010 Permit fees Administrative Decision $500.00, plus consultant Section 14.04.070 Appeal Fee fees Administrative Review $500.00 Permit Section 14.08.010 Building Permit Attachment A Section 15.04.030 Building Permit Extension $150.00, plus actual cost of Section 15.04.040 inspections Mechanical Permit Attachment B Section 15.04.010 1 /18/2007 5 Fee Schedule Authority is delegated to the Section 17.44.030 city manager to increase or decrease fees for development permits to reflect, as closely as possible, the actual cost to the city of processing development permits; provided that the city manager must submit any proposed modification to the city council, at its regular meeting, not less than 45 days prior to the effective date of said modifications and the council may reject any proposed modifications. Accessory Dwelling Unit Registration Fee Special Use Permit — Satellite Receiving System Sign Permit $175.00, plus consulting fees $100.00 100.00 Section 17.50.040 (E) Section 17.52.060 (B) Section 17.80.100 (B) 1/18/2007 6 I i i i Sign Impound Fee 1 $25.00 1 Section 17.80.140 Critical Areas Alteration Permit $50.00, plus consultant costs Section 18.12 Other Concealed Weapon Permit $60.00 Original $32.00 Renewal $42.00 Late Renewal RCW 9.41.070 Reconsideration $500.00 Reroof $175.00 Comprehensive Plan Amendment Fee $4,000.00 Permit Replacement $100.00 Zoning Ordinance Amendment $4,000.00 1 /18/2007 7 TABLE A — BUILDING PERMIT FEES TOTAL VALUATION FEE $1.00 TO $500.00 $25.00 $501.00 TO $2,000.00 $25.00 for the first $500.00, plus $3.20 for each additional $1,000.00, or fraction thereof, to and including $2,000.00. $2,001.00 TO $25,000.00 $73.00 for the first $2,000.00 plus $14.75 for each additional $1,000.00 or fraction thereof, to and including $25,000.00. $25,001.00 TO $50,000.00 $412.25 for the first $25,000.00 plus $11.00 for each additional $1,000.00 or fraction thereof, to and including $50,000.00. $50,001.00 TO $100,000.00 $687.25 for the first $50,000.00 plus $7.50 for each additional $1,000.00 or fraction thereof, to and including $100,000.00. $100,001.00 TO $500,000.00 $1,062.25 for the first $100,000.00 plus $6.00 for each additional $1,000.00 or fraction thereof, to and including $500,000.00. $500,001.00 TO $1,000,000.00 $3,462.25 for the first $500,000.00 plus $5.00 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00. $1,000,001.00 AND UP $5,962.25 for the first $1,000,000.00 plus $3.35 for each additional $1,000.00 or fraction thereof. DEMOLITION OF AN EXISTING BUILDING ....... :....................................... $100.00 PLUS CONSULTANT COSTS RELOCATION OF A BUILDING/MOVE A BUILDING INTO THE CITY.. ..... ..... $250.00 INITIAL PLAN REVIEW .......................................... ................................ 65% OF PERMIT FEE ADDITIONAL REVIEW OF CORRECTIONS, REVISIONS, ADDITIONS .......... CONSULTANT COSTS REVIEW OF DEFERRED ITEMS.............................................................CONSULTANT COSTS ONE INSPECTION & ONE RE -INSPECTION .............................................INCLUDED IN PERMIT FEE ADDITIONAL RE -INSPECTIONS FOR COMPLIANCE.................................CONSULTANT COSTS WORK NOT READY FOR INSPECTION WHEN SCHEDULED......................CONSULTANT COSTS INSPECTIONS FOR WHICH NO FEE IS SPECIFIED..................................CONSULTANT COSTS WORK STARTED WITHOUT A PERMIT...................................................FEE IN AMOUNT OF PERMIT FEE, BUT NOT LESS THAN $100.00 1 /18/2007 TABLE B - MECHANICAL PERMIT FEES Permit Issuance 1. For the issuance of each mechanical permit......................................................................................................$25.00 2. For issuing each supplemental permit for which the original permit has not expired, been canceled, or finaled .........................7.60 Unit Fee Schedule 1. Furnaces For the installation or relocation of each forced -air or gravity type furnace or burner, including ducts and vents attached to such appliance, up to an including 100,000 Btu/h (29.3 kW).........................................................................................15.50 For the installation or relocation of each forced -air or gravity type furnace or burner, including ducts and vents attached to such appliance, over 100,000 Btu/h (29.3 kW)..........................................................................................................19.10 For the installation or relocation of each floor furnace, including vent........................................................................15.50 For the installation or relocation of each suspended heater, recessed wall heater or floor -mounted unit heater .........................15.50 2. Appliance Vents For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit................7.60 3. Repairs or Additions For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code.............14.50 4. Boilers, Compressors and Absorption Systems For the installation or relocation of each boiler or compressor to and including three horsepower (10.6 kW), or each absorption system to and including 100,000 Btu/h (29.3 kW..................................................................................................15.50 For the installation or relocation of each boiler or compressor over three horsepower (10.6 kW), to and including fifteen horsepower (52.7 kW), or each absorption system over 100,000 Btu/h (29.3 kW) to and including 500,000 Btu/h (146.6 kW).....................28.50 For the installation or relocation of each boiler or compressor over fifteen horsepower (52.7 kW) to and including thirty horsepower (105.5 kW), or each absorption system over 500,000 Btu/h (146.6 kW) to and including 1,000,000 Btu/h (293.1 kW)...............39.10 For the installation or relocation of each boiler or compressor over thirty horsepower (105.5 kW) to and including fifty horsepower (176 kW), or each absorption system over 100,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW)..................58.20 For the installation or relocation of each boiler or compressor over fifty horsepower (176 kW), or each absorption system over 1,750,000 Btu/h (512.9 kW)..........................................................................................................................97.30 5. Air Handlers For each air -handling unit to and including 10,000 cubic feet per minute (cfin) (4719 Ls), including ducts attached thereto ......... 11.20 Note: This fee does not apply to an air -handling unit which is a portion of a factory -assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code. For each air -handling unit over 10,000 cfin (4719 Us)............................................................................................19.00 6. Evaporative Coolers For each evaporative cooler other than portable type.............................................................................................11.20 7. Ventilation and Exhaust For each ventilation fan connected to a single duct.................................................................................................7.60 For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit ..................11.20 For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood............................11.20 8. Incinerators For the installation or relocation of each domestic -type incinerator.............................................................................19.10 For the installation or relocation of each commercial or industrial -type incinerator..........................................................25.50 9. Miscellaneous For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other appliance categories, or for Which no other fee is listed in this table............................................................................................................11.20 For all gas piping system fees see King County Health Department fee schedule. 10. For permits requiring a mechanical plan review, permit fees shall be determined by valuation and calculated using Table A. 11. Plan Review, Initial...........................................................................................................25% OF PERMIT FEE 12. Additional review of corrections, revisions, or additions............................................................CONSULTANT COSTS 13. Review of deferred items...................................................................................................CONSULTANT COSTS 14. One inspection & one re-inspection.......................................................................................Included in Permit Fees 15. Additional re -Inspections for compliance...............................................................................CONSULTANT COSTS 16. Work not ready for inspection when scheduled........................................................................CONSULTANT COSTS 17. Inspections for which no fee is specified.................................................................................CONSULTANT COSTS TABLE C — GRADING PERMIT TOTALYARDS FEE 25 TO 100 YARDS $100.00 101 TO 500 YARDS $100.00 for the first 100 yards plus $10.00 for each additional 25 yards, or fraction thereof, to and including 500 yards. 501 TO 1,000 YARDS $260.00 for the first 500 yards plus $12.00 for each additional 25 yards, or fraction thereof, to and including 1,000 yards. 1,001 TO 2,000 YARDS $500.00 for the first 1,000 yards plus $13.00 for each additional 25 yards, or fraction thereof, to and including 2,000 yards. 2,001 YARDS AND UP $1,020.00 for the first 2,000 yards plus $13.50 for each additional 25 yards, or fraction thereof. PLAN REVIEW.......................................................................CONSULTANT COSTS ONE INSPECTION & ONE RE-INSPECTION...............................INCLUDED IN PERMIT FEE ADDITIONAL INSPECTIONS FOR COMPLIANCE........................CONSULTANT COSTS TESC AND DRAINAGE SYSTEM PLAN REVIEW.........................CONSULTANT COSTS SEASONAL TESC/EROSION CONTROL INSPECTIONS ...............CONSULTANT COSTS INSPECTIONS FOR WHICH NO FEE IS SPECIFIED .....................CONSULTANT COSTS Note: Up to 50 cubic Yards of excavation, necessary for a basement or crawlspace, are exempt from fee calculation. Notes on 2007 Fee Schedule 1..This fee schedule has no dollar value changes from 2006 2. Changes incorporated are editorial or reference only a. Page 4 Chap 12.28, The work Mitigation is used in place of Removal and the reference is change to Section 12.28 to be compatible with our tree ordinance b. Page 4, Chap 12.28, A clarification is added to show that no charge is required for a Tree Mitigation Permit not occurring during development c. Page 7, Chap 17.94, Historical Use Permits are added under Reclassificaion of Zoning District d. Site Plan Review Fee now has a chapter reference to 14.12 and will be moved there in the final document e. Table A — Building Permit Fees, A note is added clarifying that up to 50 yards of excavation are exempt from the calculation No other changes have been made to the 2006 Fee Schedule 1 /18/2007 9