Loading...
HomeMy WebLinkAbout03-26-2012 - Agenda PacketMEDINA, WASHINGTON MEDINA CITY COUNCIL SPECIAL MEETING AGENDA St. Thomas Church, Conference Room 8398 Northeast 12 Street, Medina MOND", MARCH 26, 2012 4:00 PM MAYOR MICHAEL LUIS DEPUTY MAYOR KATIE PHELPS COUNCIL MEMBERS PATRICK BOYD JAY DECKER DOUG DICHARRY DAVID LEE JANIE LEE CALL TO ORDER ROLL CALL DISCUSSION ITEMS 1. Department Work Plans (Summaries will be distributed at meeting.) 2. Council Vision/Strategic Goals 3. Council Committees a. Personnel Committee b. Public Works/Facilities Committee c. Budget/Finance ADJOURNMENT Next Regular Meeting: Monday, April 9, 2012; 6:30 pm ON GET CONNECTED! STAY INFORMED! SIGN UP FOR MEDINA E-NOTICES. Visit www.medina-wa.eov and click on E-Notice Program. CITY MANAGER DONNA HANSON CITY ATTORNEY BRUCE DISEND CITY CLERK RACHELBAKER 4:00 pm 4:00 — 5:30 pm 5:30 — 7:00 pm 7:00 — 7:30 pm Medina City Hall 1 501 Evergreen Point Road I PO Box 1441 Medina, WA 98039 425-233-6400 1 www.medina-wa.gov CENTRAL SERVICES DEPARTMENT 2012 WORK PLAN CENTRAL SERVICES DEPARTMENT 2012 WORK PLAN In the renovated City Hall central and development services staff work in even closer proximity than previously which has provided an opportunity to offer greater efficiency in service delivery between the two departments. Collaboratively staff is able to deliver improved service through cross training, sharing specialized information, and utilizing improved technologies. The Central Services Department is comprised of three staff members: City Clerk/Human Resources, Administrative Assistant, and Information Systems Coordinator. The Central Services Department is responsible for achieving City Council's communication strategic goal. The 2012 department work plan addresses initiatives designed to build upon last year's communication and outreach successes and attain a more efficient, effective and engaging program. In addition to fulfilling the council's communication goal, department staff also provides general customer service to the public, and delivers services internally to elected and appointed officials, city consultants and staff while also managing a wide-ranging workload of essential services. Many of these are highlighted below and on the attached 2012 work plan. Department's Essential Services in Brief: • Maintain staffing levels to provide customer service during business hours at front counter and by phone to internal and external customers. • Offer passport, animal licensing, notary and permitting services. • Cash management, including cashiering, cash deposits, pass through billing, petty cash, and accounts payable processing. • Maintain desktop and telephone functionality, including coordination with related vendors & service providers. • Keep council chambers recording equipment updated and in good repair. • Office equipment maintenance and troubleshooting. • Manage public records requests for city administration departments. • Prepare and communicate public notices, meeting agendas and minutes, and attend meetings. • File and records maintenance and management, including retention and destruction responsibilities. • Office supply ordering. • Mail retrieval and distribution. • Department budget monitoring and development and invoice processing. • Communications and outreach through a variety of tools and resources, including city website, electronic records repository, electronic bulletins, postcard mailings, onsite and electronic postings. • Recruitments for City boards and commissions and employment opportunities • General human resources management City Council Strategic Goal: Communications: Maximize public awareness and involvement in City business with continuous improvement of communication strategies and industry standards to deliver timely information regarding city services, programs, and events. Department goals for 2012 are: 1. Continue to meet, improve and expand upon essential services demanded of and Provided by department staff, including: a. Manage public records and records management programs 1. Continue to successfully manage public records requests 2. Continue to oversee retention and destruction of records 3. Develop and experiment internally with desktop email management 4. Devise and establish tracking and monitoring system for electronic records and postings 5. Increase quantity of records available on City website and in records repository b. Manage human resources functions for City 1. Offer combined quarterly training opportunities for all staff 2. Recognize staff anniversaries quarterly 3. Implement personnel guidelines 4. Develop and test intranet site for City employees 5. Overseeing lifeguard and volunteer recruitments c. Continue to provide interdepartmental support to city manager, finance and development services. Provide general assistance to elected and appointment officials. Meet state and local requirements for OPMA. 1. Increase knowledge and information shared between employees and departments to aid with providing excellent customer service, internally and externally, and to meet state and local state statutes. (Strategy can be met through increased cross -training, and sharing of information of records on intranet and City website.) 2. Increase interdepartmental back up and support to finance and development services d. Provide responsive and effective desktop and telephone support and related information technology services. Manage, coordinate, and monitor vendors, service providers and products Provide responsive assistance internally and externally in response to IT -related matters 3 2. Build upon 2011 community outreach eoals and successes a. Devise best practices and processes to deliver higher quality and better management of department products and services 1. Develop internal best practices from conception to delivery of communication product for efficient, sharp and well -managed program b. Increase outreach tools to successfully deliver information and engage community 1. Introduce polling to Govdelivery network subscribers 2. Add city manager corner to City website for access to weekly and monthly reports 3. Add city projects corner to City website for access to information concerning current city projects 4. Consider addition of public computer kiosk in lobby for access to City records 5. Survey City volunteers and community members for fresh outreach ideas 6. Evaluate whether current service hosts for City website and online records storage provide the best product within budget constraints c. Increase volume of newsworthy information delivered to subscribers 1. Determine newsworthiness of data, community needs and desires, and deliver suitable bulletins and postings based upon outline of city council's 2012 strategic goals 2. Increase wealth of public records and information on the city website, and File Pro d. Continue to build and grow Govdelivery through stabilized and increased subscriptions and increased bulletins delivered 1. Rename, eliminate and/or increase bulletin topics in Govdelivery 2. Continue to promote service in and out of City boundaries 3. Increase engagement of bulletin recipients e. Continue to expand information available on City website and continually improve ease of use 1. Consider implementation of ideas from users 2. Improve internal posting processes 4 o F+ 3 CN '* G � O {A � � � 2 of n 7 H v A 'a 0! N 3 �r 00 v rn O 3 0 0 v -1n m 0 mwp 3 m� m CCU O L1 a o, ID 3 d _» 'a o m '0 o �o < 0 3 D '* a O >o o -, r o 3 N fD m 3 3 Vf ? 7 (� N n f� 1 rD � 1 1 7 00 W m of v •+ j �° y� rb 7o m N h 0° of a H m n C � N' rD °J cOi n n 3 r, � o v3i c 3 3 C c '* o n O 1+ D C `< N c coo O3o m 4 v, r 3 O N o O to j j rD ,�f 3 ;; m ; UQ m O C flit O r0 D Nf 0Cb " 4 ID C �_ H 0 W CCL N = 1:0 H N 7 7 mm m a a aICU mcu n ffDa m Tl n A c d C ro 0 I C S N A O m f+ 3 N r+ 0! O (D M n' d y v to V of 7 �f ill► EMU#]I[Ma1139±1k •lug*KI �I[sl0MOUwi The 2012 Medina Police Department (MPD) Operational Plan represents the collaborative effort of MPD employees to identify goals and prioritize our work activities for the next year. The plan includes goals, objectives, strategies, and performance measures. The plan is intended to be used by all department employees to help them prioritize work, focus on objectives, and help us to evaluate our performance over the coming year. Our 2012 goals are: 1. Enhance department results in fighting crime and maintaining public safety 2. Ensure MPD employs recognized best practices and meets the highest standards of professional policing 3. Strengthen partnerships with the community MPD experienced and overcame numerous changes in 2011 as we worked together to enhance the services we provide to the citizens of Medina and Hunts Point. As the MPD moves forward in the coming years, it will take the collective work of our talented staff to collaborate with our community and citizens, to address emerging law enforcement and security concerns. There remain many challenges and opportunities to enhance plans and programs that will benefit our residents. MPD will achieve success through working with partners both inside and outside the city. Sincerely, Chief Mark Thomas 2 Admin Specialist Courtney Meyer Chief of Police Mark Thomas Lieutenant Dan Yourkoski cords Manage Linda Crum Sergeant John Kane Officer Officer Emmet Knott Mike Girias Officer �� Officer Brady Halverson James Martin Officer Officer Christina VACANT Morovics 9 THE MEDINA POLICE DEPARTMENT Mission The Medina Police Department is committed to protecting life and property, maintaining order, enforcing the laws of the State of Washington without prejudice, and working cooperatively with the public to provide a safe community for all. Vision To provide the highest quality public service that exceeds community expectations Values The Medina Police Department is committed to: • Professional excellence • Acting with integrity • Accountability for our actions and the resources entrusted to us • Exceptional responsiveness to community needs • Respecting and protecting individual rights • Empathy and compassion for others MPD Agency Goals Goal 1 Enhance department results in fighting crime and maintaining public safety Goal 2 Ensure MPD employs recognized best practices and meets the highest standards of professional policing Goal 3 Strengthen partnerships with the community 4 Objectives/Strategies/Targets Objectives Strategies Performance Measure Priority 1.1: Increase officer • Establish daily officer work visibility reports that are reviewed by 1. Increase Traffic Stops supervisors that track daily by 15% activity and hours Baseline — 100% of 2011 • Prioritize proactive patrols Target — 115% of 2011 and vehicle stops • Track house checks 2. Average at least one completed by officers house check per day for • Reduce officer time in the each house in the program office Baseline —Not Tracked Priority 1.2: Leverage . Develop a multi -year work 3. Complete multi -year technology plan that includes the work plan for expansion deployment, upgrade, and replacement of expansion, and lifecycle surveillance cameras and cost of camera systems software • Increase the visibility of 4. Have officers attend cameras/signs investigative training • Identify software to achieve identified in the training greater efficiency in plan managing and searching Baseline — 0 data Target — 1 Priority 1.3: Investigate crimes 0 Provide basic investigations effectively training to officers • Increase investigative experience through rotating officer involvement in the coalition's major crimes task force Priority 1.4: Focus on traffic , Proactive traffic patrols safety • Targeted traffic patrols towards complaints and known problem areas virus 0 E Objectives Strategies Performance Measure Priority 2.1: Attain • Adopt new Lexipol based Policy 1. Attain State Washington State Law Manual Accreditation by the Enforcement Accreditation . Contract with the Washington end of 2012 Association of Sheriffs and Baseline — Not Police Chiefs for a department Accredited audit through their LEMAP Target — State program Accreditation • Start accreditation process 2. Complete Training Plan by Jan 31, 2012 Priority 2.2: Evaluate the • Complete a multi -year Training MPD Training Program to Plan that documents when ensure it meets required required and prioritized training 3. Complete Career standards and provides for will be scheduled Development Plan by professional development and . Complete a career development Mar 31, 2012 training in high liability areas plan that identifies required and suggested training for officers based upon the stage of their career and department assignments Objectives Strategies Performance Measure Priority3.1: Regularly using • Regular officer interaction with 1. Officer visiting each the resources of the department schools including providing elementary school to partner with community educational presentations during each full month groups and individuals • "Shredder Day" provided for the of the school year community to reduce Baseline — Not Tracked vulnerability to identity theft Target - 21 Visits • Designate a Block Watch officer to work with the department's 2• Shredder events crime prevention/records completed manager Baseline — 2 Target — 2 • Timely notification to citizens Priority 3.2: Effectively use of crimes/trends 3. E-lert messages sent the E-lert system • Proactive crime prevention at least twice per month messages Baseline — 33 Target — 24 Priority 3.3: Strengthen • All officers involved in community emergency emergency preparedness and 4. Training for all preparedness familiar with incident officers, in Medina commander responsibilities specific emergency • Include emergency preparedness g y p � management and in school contacts/presentations incident commander • Inventory current city responsibilities. Baseline — 0 capabilities Target — 8 • Develop a prioritized list of what capabilities should exist to have a prepared Medina Anticipated Workload and Population Trends The population and traffic patterns in Medina and Hunts Point are expected to remain relatively constant in 2012 resulting in a similar overall workload for the Medina Police Department. In 2011 there was a significant increase in property crimes in both Medina and Hunts Point, while violent crimes decreased from already exceptionally low numbers. Calls for service have remained low allowing officers significant time for proactive patrols. Proactive patrol activities designed to impact crime and enhance traffic safety will consume available resources regardless of call volume and crime investigations. Anticipated Staffing Levels The authorized staffing level of nine commissioned officers and two support positions is expected to be sufficient to meet the needs of the city, and for the department to accomplish its goals in 2012. There is currently one vacancy for an officer that has been vacant for all of 2011. The position is expected to be filled in 2012. The 2012 budget for overtime is $85,000. This amount is less than the actual average expenditures over the last several years, but is expected to be sufficient to meet the department's requirements. Overtime is most commonly used to ensure at least one Medina Police Officer is on duty 24 hours a day, every day of the year. Overtime is the most efficient means to fill the inconsistent additional needs for officers. While increased full time staff would enhance the overall safety and security of the community, it would not completely eliminate the need for overtime due to unanticipated short notice requirements. Anticipated Capital Improvements and Equipment Needs Funding support for the police department has been outstanding and has resulted in a department that is well staffed and equipped. The police department is fortunate to have an outstanding office facility that meets all the needs of the department. The police department needs to maintain current funding levels to replace one police department vehicle per year. 0 In the coming years, significant equipment costs are expected to be incurred for the city's camera system and the department's command vehicle. The 2012 budget provides $250,000 for additions or upgrades to the camera system. A multi -year work plan will be completed in 2012 to suggest the timing and total cost for an integrated system that can be implemented in multiple phases. Funding for 2012 will be adequate for the first phase of the plan. It is anticipated that a relatively constant yearly funding for the system will be requested starting in 2013 that provides for the lifecycle cost to maintain the expanded system. The 2012 budget provides $5,000 for the maintenance and replacement of equipment on the command vehicle. It is anticipated that with the increasing age of the vehicle and its equipment, that the budgeted amount will not be sufficient to cover the needs of the vehicle. Current repairs or replacement needs for the vehicle exceed the total yearly budget for the vehicle, and it is unlikely that there will be sufficient grant funds available to absorb repair costs. N v W -0. m m 3 w 3 m o w N w m d z w � d Z O m m m 3 m 'g u, � o• c 3 3 3 3 w w 0 0 c v � ttA N N N N N N N dW 'oW8O—DV OLoTU J v cn m m a f ice_ a aW—m o m n �m 0ov 3occ -o onc w-1 w c aGNa S t4 fir go a fn Oo N C CD G w< fD w (D CD � ?1 x o: ' 2 x °�-' D W p D 'o v 3 01 o'i 2 �• <� Z 0 o O ' a c 0 c w' i m wtpD) co o m Z m (A N < z a a CT tll• C (a (n R O tD 7 a 'O a>; ml � � m cn = n O p 5 w 03 � 3 v v < O c cn 3 3� g 3 :: m 3 � o M v -o Qo �' o0 0 0++ 3 n 3 o n�.�m �O�0/o�i � am w m ' 0 9 _ 3.. co 31 `� to 3 m a 5 0 m o 3 3 �'+ o c c rA o w OL w p o 0 o, 0 � _ i W � V A t7i tr J W CA to Cn tr N N J A A N to — O CA 0) CA Cr to c N �O J O CAC Co v o' a s w w a� aw aaa w w aaaaaCL aa aCL aw� c fA fA fA `<. y CA N y fA w 1.aw w w w w w w y N N w N N fA N w y N ca O O O O c -Cp O 7 7 O O O O O O O O O O 7 0 0 0 O c 7 7 0 O 7 7 7 o O O M 0 0 7 7 o> O OCA Ncn V OWA 2 AWW0 jOO N N N N N�N JW` J Ni NNJ N J N `A N N N jA l 3i 3: O O o o -n -n 7 C NC 0 M. 00 op �• �l j T1 _ 00 00 00 00 = T1 ;• O co O OD �_ O O� �_ f0 (` A O_ CO V O t` A s CO W n G w IO � �� CA N n O I C II� � A r!Rj z 3 C x 3 3 0 r. CA o N o C m w 7C c 3 W y 0 m N� 3 N 7 0 e v -n 0 3 � CD ppT 7 N fQ N 7 a wo In W V1 7 �G in in � C C 3 3 3 3 w w 0 c v u OI (ID;OODi CA se AI WI NI --I OI CNOI g — a m ca m �1m w w x obi -o> * W d m g Z 0 a 0 a» � 3 0 ''^^ V - f0 O O 3 O ? O, fn N 3 � r PO v CWif CCA A A N co A+ - - C m 0 a 0. a a 0 0 aID o w 0 N N N y fA N fA w N _ 10 O CD 0 O 00 OI N N N N N N N N NL -n -n i c 0 0 01 of 0 > 0I 3. =. C <D 7 �_ ` w C J j 31 � W J J 0 J J L IN) N N N N N N N N �i�l�•I�lil to 0 t•1 ! X N !g O 1 0 N a O Ai X M F� Z Z la I Imo! mI 0 v o c 3 MT Z �°•w vNcpmm D3 039 33g30Z�8n ���0��� 3�� gap* N m m D0 3 a g r. o� a ch - 0 o a m CT fT A-•ppl tl�pN 0p10 _ C7�pi W Ntlt Upf v Cf� O O pO O O O O O O O O O O O O O O O O naaannaaaappnaaaaaa � m tN7�CN71OW NCN7�N W C, Of C�7i� C,�ON/GN1 N N N N N N N N N N N N N N N N N N A 0 0 �1 �� o = O O O a irD N ia3NN N N N N N m ' o D n D ,o N ' N D N t0 \ O1 W aZ N O M -h ? D a; -a,•a N p• N 0, O N N � N N Q• NO 7 a- C)) M O 0) C CL 0 Nv R Q. :. �Q Q 0 r-1• in 0 =r CD a C m CA • o m 3 cu tD C � m y. rr =r0 M CD C. Q 0 (D:3 3 N a� CD �N 0 0 �Q Tc,ow 3 OD 0 = O 0 4 � 0 -4 > N co OD CA) co. O 0 L to C 3 m X N 0 W Go T� i C m c m z m 3 �o M 0 m m z n 0 v m F r TTO Z X G) X m 0 2 v C r m , Q cr w o c (A a Evr42+�vci•rt Rd t. '0 'Bth Ate NF "r - 3 T 84th Ave'NE z Ivr 92nd Ar? \E 92nd Ave NE r))nd Ave NC \. 9;nd 6+ 3N 56:h Av- NE C :3 G• - Y y".. , a ' 3Nth Ave NE • -.r %,� y -�+'• 3% wtl w00l 'cirtn Ara N+ it - 'NeDcp m to a D RCj r1a9 '" r- Rr8rnxWay NE ro . 00 a �b 3 AquaTechnn " Ad4ancin,, the Science of Lake Mari,o;rert" City of Medina Attn: Joe Willis, Director of Public Works 501 Evergreen Point Road Medina, WA 98039 City of Medina — Medina Park: Water Quality Testing and Nutrient Mitigation Proposal P.O. Box 3005 Lynnwood, WA 98046 Tel: (206) 462-0608 www.aouatechnex.com The City of Medina has in its possession a jewel located in the southern region of the city known as Medina Park. The Park -Medina Park combines two ponds, walking paths, and large open grassed areas to create a natural and aesthetically pleasing setting for residents to enjoy. Medina Park's two ponds have many issues associated with urban storm water systems. The two ponds located in the heart of the park are approximately .75 acre and 1.5 acres in size, with an average depth range of 4-6ft. The two ponds provide a runoff water catchment and detention of approximately 177 acres of developed urban area. They are hydraulically connected through a central stream and the flow rate is controlled through an adjustable weir system. Water exiting the ponds flows through a channel for approximately 2,000 linear feet and discharges into Lake Washington. Due to the high volume of nutrients flowing into the ponds from the surrounding water shed, water quality has become of concern. The effects of high nutrient content within the ponds can be seen by the presence of algae blooms, and the buildup of organic material. Phosphorus is a limiting nutrient in plant and algal growth, and high phosphorus levels are an indication of poor water quality. The primary focus of this document is to provide a detailed description of work and estimated costs associated with implementing a water quality testing program, recommendations for basin management strategies, and evaluating treatment alternatives. Water Quality Testing Program AquaTechnex can provide accredited laboratory testing for use in water quality analysis. In order to identify possible pollutants suspected of contributing to the poor water quality of the Medina Park ponds. We recommend a Water Quality Baseline and sediment analysis. Within a Water Quality Sampling Program, sampling is to be conducted early in the spring season before nutrients become tied up in vegetative growth. A water quality analysis will allow for a full profile of the pond's current operating status. Secondary testing is recommended to take place at the conclusion of each season a treatment plan is implemented. We further recommend that testing be conducted annually in order to properly track changes in water quality. This form of a water quality testing program will provide applicable numbers in identifying contributors of poor water quality, provide necessary information in developing management strategies, and aid in evolving the long term goals of improving the overall water quality of the Medina Park ponds. As past testing has identified that high phosphorus levels have attributed to the poor water quality of the Medina Park ponds, the Water Quality sampling program we recommend includes a full spectrum phosphorus analysis with the intention of providing all necessary data with which to develop phosphorus mitigating treatment plans. A Water Quality Baseline testing analysis tests for alkalinity, conductivity, dissolved oxygen, hardness, free reactive phosphorus, total phosphorus, and turbidity. The sediment testing will indicate the total phosphorus present in the pond sediment. Testing will include one water sample and one sediment sample per pond or per sample location. Costs associated with suggested testing for the Medina Park ponds total $992.00. Additional testing of inflow and outflow water quality is also available upon request. See table 1 for further description of tasks and costs associated. Treatment Alternatives Upon the review of the water quality testing results we recommend utilizing nutrient sequestering treatments to improve water quality in the Medina Park ponds. The removal of excess nutrients can allow for the proper functionality of the storm water ponds. Only those treatments that have proven effective in sequestering the nutrients that come under question will be employed. All listed treatments under consideration are further dependent on receiving coverage under the NPDES permit due to the continuous outflow of the ponds into waters of the state. Treatments conducted on non -state waters must have the outflow restricted for two weeks post -treatment to mitigate coverage under the permit. Costs associated with obtaining coverage under the NPDES permit total $2000.00. (Nutrient mitigating treatments are not covered under the NPDES phase H permitting for storm water retention ponds that continually discharge into waters of the state) Phosphorus locking technology (Phoslock) Phoslock, phosphorus locking technology, is a technology proven around the world in its ability to permanently remove phosphorus from a water body and stem the internal reloading of phosphorus from the sediment. Phoslock contains lanthanum, a naturally occurring earth element embedded in a bentonite clay matrix. Phoslock is produced through a patented ion exchange process where the lanthanum ions displace sodium ions within the clay. This process allows for lanthanum to be absorbed into a non -toxic carrier while retaining its ability to react preferentially with phosphorus once applied to the water body. Phoslock is applied to the surface of the body through a slurry mixture. While moving through the water column, Phoslock permanently binds the Free Reactive Phosphorus resulting in a stable non -toxic mineral that becomes an inert component of the sediment and is no longer bio-available. As Phoslock settles along the bottom of the pond, a layer is formed on top of the sediment creating a phosphorus cap of the hydra -soil. This cap continues to bind phosphorus released from the sediment stemming internal re -loading of phosphorus. The Phoslock cap also continues to bind incoming phosphorus from the watershed until all available lanthanum is bound. This continuous binding of phosphorus is another way in which Phoslock becomes a cost effective approach to phosphorus mitigation. There is no known toxicity to aquatic life. Phoslock is unique in that it allows for calculable removal of known phosphorus levels. One can determine the amount of phosphorus present and calculate the exact amount of Phoslock needed to remove it. Labor and mobilization costs total $1,500.00. Rates and product costs associated with a Phoslock treatment are dependent on water quality testing. (Conducting a rough price estimate results in a price range from $2,000.00 to $8,000.00 to treat both ponds) Aluminum Sulfate (Alum) Treatments utilizing Alum are a known to be effective in removing phosphorus from water bodies and as a water clarifier. Upon application Alum takes the form of Aluminum hydroxide which is visible in the water as a white floc. In this form, the Aluminum hydroxide binds with phosphorus creating a compound insoluble in water and unavailable as food for vegetative growth. Alum has a tendency to bind with other particles in the water resulting in a clarifying affect. As the resulting floc settles and becomes incorporated within the sediment, binding of phosphorus continues until all available Alum has been bound. Alum does hold a few stipulations in that during an application continuous monitoring of pH levels are required as shifts in pH may result in water quality issues and require the application of a buffering agent. Costs associated with buffering agent are fully dependent upon water quality analysis and Alum dosage. Future shifts in pH can also result in re-release of bound phosphorus. This is rare but known to have occurred. Labor and mobilization costs total $1,500.00. Rates and product costs associated with an Alum treatment are dependent on water quality testing. (Conducting a rough price estimate results in a price range from $1,125.00 to $5,000 to treat both ponds) Lake Bacteria Beneficial lake bacteria can be utilized to sequester minor amounts of nutrients as a long term treatment option. Injections of naturally occurring lake bacteria can be used to maintain a heightened bacterial population in order to aid the natural processing of excess nutrients and organic material. As excess nutrients stimulate the overgrowth of aquatic vegetation, lake bacteria can be used as a competitive biological agent. This program option is best utilized during low -flowing months as a maintenance tool. If water quality tests result in a heightened nutrient load then lake bacteria should be reserved as a secondary course of action to a significant nutrient reducing treatment. A typical lake bacteria injection program conducted by AquaTechnex staff requires three injections per year at a total cost of $2,120.00/year. If applied by the City of Medina staff, product costs total $1,520.00. A 10% discount is applied to bulk purchases of lake bacteria that are applied by the City of Medina. See table 1 for further description of tasks and costs associated. Basin Management Strategies The suggested basin management strategies are geared toward improving overall water quality of the Medina Park ponds and to improve the functionality of the catchment basin in reducing possible pollutant discharge. Riparian Buffer Improvements The riparian buffer surrounding a water body provides vital filtering capabilities that can directly impact water quality. Water flowing off the surrounding land can pick up nutrients, soil particles, and varying forms of pollutants, carrying them directly into the water body. As water flows through a properly functioning riparian buffer significant amounts of suspended solids are removed, nutrients are utilized by the growing vegetation, and the flow rate is reduced stemming agitated disruption of the pond sediment. The riparian buffer is also an important tool in reducing shoreline erosion. As certain plant species can better retain shoreline soils, others can displace the soil encouraging further erosive processes. Improvements can be made over time as part of an overall basin improvement plan. AquaTechnex can provide consultation on riparian improvements, as well as aid in developing future riparian improvement projects. Tasks and costs associated will be proposed with future management plans. Community education and outreach An important step in improving our community's water ways is through community education and outreach. Aquatechnex can provide annual meetings in which we address current water quality issues facing the community, steps taken to improve water quality, and actions residents can take to reduce pollutant runoff. Similarly, AquaTechnex staff can be available for community sponsored events. We can develop distributable information that provides up to date knowledge concerning the water quality and the aquatic sciences. We look to empower residents to take action within their community when viewing potential water quality issues. AquaTechnex has over twenty-five years of experience in providing quality pond and lake management. The programs offered are designed to deliver applicable solutions to the ongoing problems afflicting the Medina Park ponds. We are pleased to have the chance to present our services to the City of Medina. Sincerely, P7" 9ft77ow Adam Harrow Aquatic Specialist Phone: (206) 462-0608 Email: aharrow@aquatechnex.com Web: www.aguatechnex.com Table 1: Tasks and Costs Associated Task Description Cost Water Quality Baseline Analysis [Alkalinity, Conductivity, $162.00/sample Dissolved Oxygen, Hardness, pH, Phosphorus (Free reactive), Phosphorus (Total), Turbidity] Sediment Analysis [Total Phosphorus] $84.00/sam le Water Quality Testing- Sample collection, Sample $500.00/testing cycle Labor/Processing/Shipping processing, Packaging Materials/Reporting (cooler, icepacks, sample bottles, ect.), Shipping, and Data report Coverage Under NPDES General Permit Required for nutrient $2000.00/permit inactivation treatments into waters that discharge into waters of the state Annual Permit Renewal Fee Paid the summer before $440.00/year each year coverage is desired Phoslock Application of Phoslock to ** See description the water body for (Phosphorus locking technology) phosphorus mitigation. **Testing required for accurate pricing Alum Application of Alum to the ** See description water body for phosphorus (Aluminum Sulfate) mitigation and improved water clarity "Testing required for accurate pricing and evaluate possible need for buffering agent Buffering Agent Used to counteract changes (Dependent upon in pH for Alum treatment Alum dosage) Treatment Labor and Mobilization Costs associated with $1500.00/treatment application of nutrient mitt atin treatments Revive Suggested yearly program $1,520.00/year of lake bacteria for (product) or (Lake Bacteria) mitigating excess nutrients $1,360/year and organic material. (bulk price) Service fee is added if + performed by AquaTechnex $600.00/year service fee All above costs will have Washington state sales tax added to the invoice § io )�§ to Iz �3 �o PLUMB , IGNS PAGE: QUOTATION ONLY — THIS IS NOT A CONTRACT Customer ID: 909 South 28th Street Tacoma, WA 98409 P.253-473-3323 F.253-472-3107 QUOTATION PREPARED FOR: CITY OF MEDINA MEDINA, WA CITY OF MEDINA- Quote #: QT-9098D Quote Date: 02/17/2012 Quote Expiration Date: 02/01/2012 Contact Name: JOE WILLIS Sales Rep: WMW Email: SITE ADDRESS CITY OF MEDINA MEDINA, WA Payment Terms: Customer's Tax Exempt # (If applicable): TO BE DETERMINED Please jimtide a resale certificate if Plumb Si gns doer not have one on file: PRODUCT/SERVICE OTHER SERVICE QUANTITY UNIT PRICE EXTENDED PRICE NON_ILLUM SIGN 4 $2,383.43 $9,533.73 SINGLE FACE PARK SIGN FOR EXISTING LIGITT POLE:Provide (4) 4'-2-3/4" x 11-1/2" aluminum T-Frame sign,1/4" aluminum face panels, 3/8" flat cut out aluminum letters "MEDINA", router cut 1/2" thick scroll accents, custom mounting bracket. All elements to be powdercoated standard instock colors. **SCROLLS UNDERNEATH THE THREE ARCH'S/LIGHTS are not part of plumb signs scope of work. ---OPTION D/F PARK SIGN ---Add $500.00 to single face price. (Covers only the additional set of letters for the opposite side of sign) PRODUCT/SERVICE OTHER SERVICE QUANTITY UNIT PRICE EXTENDED PRICE INSTALLATION 4 $492.94 $1,971.74 INSTALLATION PARK SIGNS: Mount to existing light pole. PRODUCT/SERVICE OTHER SERVICE QUANTITY UNIT PRICE EXTENDED PRICE NON_ILLUI-SIGN 1 $4,314.27 $4,314.27 SINGLE FACE PARK SIGN:Provide (1) 2'-2" x T-0" aluminum T-Frame sign, 1/4" aluminum face panels, 3/8" flat cut out aluminum letters "MEDINA PARK", router cut 1 /2" thick scroll accents (Qty of 3), custom mounting bracket. All elements to be powdercoated standard instock colors. PRODUCT/SERVICE OTHER SERVICE QUANTITY UNIT PRICE EXTENDED PRICE INSTALLATION 1 $6,670.48 $6,670.48 PARK SIGN: MASONRY AND INSTALLATION: INSTALLATION OF: 1'-6" x 4'-6" height and 1'4' x 3'-0" height DUAL CULTURED STONE COLUMNS WITH CONCRETE CAP. (Cultured stone to have CMU behind) INSTALLATION OF SIGN. PRODUCT/SERVICE OTHER SERVICE QUANTITY UNIT PRICE EXTENDED PRICE NON_ILLUM_SIGN 1 $3,273.38 $3,273.38 SINGLE FACE PARK SIGN:Provide (1) 2'-6" x T-4" aluminum T-Frame sign, 1 /4" aluminum face panels, 3/8" flat cut out aluminum letters "MEDINA, City Hall, Beach Park" and two arrows. All elements to be powder coated standard instock colors. **No scrolls. PRODUCT/SERVICE OTHER SERVICE QUANTITY UNIT PRICE EXTENDED PRICE INSTALLATION 1 $600.00 $600.00 INSTALLATION OF BUILDING MOUNTED CITY HALL DIRECTIONAL SIGN. Attach flush mount to building structure. PAGE: 1 PLUMB#SIGNS, K, PAGE: QUOTATION ONLY — THIS IS NOT A CONTRACT Customer ID: 909 South 28th Street Tacoma, WA 98409 P.253-473-3323 F.253-472-3107 QUOTATION PREPARED FOR: CITY OF MEDINA MEDINA, WA CITY OF MEDINA- Quote M QT-9098D Quote Date: 02/17/2012 Quote Expiration Date: 02/01/2012 Contact Name: JOE WILLIS Sales Rep: WMW Email: SITE ADDRESS CITY OF MEDINA MEDINA, WA Payment Terms: Customer's Tax Exempt # (If applicable): TO BE DETERM NED Please provide a resale certificate if Plumb Signs does not have one on file: PRODUCT/SERVICE OTHER SERVICE QUANTITY UNIT PRICE EXTENDED PRICE SURVEY 1 $250.00 $250.00 SITE SURVEY: Verify install conditions --PLEASE NOTE --install pricing based on upfront easy access to install location. Street Permits, flaggers and working overtime will all be addtional charge if required. For ground signs, bid for installing in flat dirt area. Please check with your sales representative about leasing options. QUOTE TOTAL: s26,613.60 Exclxsi— tax, pe—tr, parking permits, engineering, traffic contro4 credit check fee, and speaal inspections iif nq--d Time clock not included in price. This it a mquirement by the Cities of Seattle and Tacoma. please note. permits are at cost with a minimum charge of,$26250 for the procurement fee. TLds is in addition to the quote total Time clocks arenot induded in the price unless noted The quote is also based on easy access to the insw& on location with 120v penmwy power provided and it designated circuit being located up front for hookup and secondary wiring access ifappb'eable. PAGE: 2 P.O. Box 3005 Lynnwood, WA 98046 Aqua echnex Tel: (206) 462-0608 www.apuatechnex.com Ovatic.;,,g the Scielxce of Lake Aianagzruent' City of Medina Attn: Joe Willis, Director of Public Works 501 Evergreen Point Road Medina, WA 98039 City of Medina — Lake Washington Shoreline Scope of Work and Associated Costs Western Washington is fortunate enough to have such a rich diversity of natural resources. One of the most cherished is the fresh water of Lake Washington. Like many fresh water bodies in our area, Lake Washington has been dealing with invasive and nuisance aquatic weeds for some time. One of the most well-known of these aquatic weeds is the invasive species known as Eurasian Water Milfoil. This species alone can reproduce rapidly and inundate large areas very quickly. Other species may be present and become a nuisance which can be identified upon inspection. For the City of Medina and residents living along the Lake Washington shoreline, overgrowth of aquatic vegetation can present a real problem when accessing the lake. Due to the size of Lake Washington eliminating the problem would be impossible. For this reason alone it is in the best interest of every shoreline resident to invest in an aquatic plant management plan. The considered scope of work and associated costs for managing the Lake Washington shoreline within the City of Medina is broken down into five tasks. Table 1 at the end of this document summarizes all tasks and costs associated. Task 1: Obtain Coverage under the NPDES permit Lake Washington is considered waters of the state and coverage under the Washington State NPDES permit is required. Once approved, AquaTechnex would be pleased to manage all preparation and filing for coverage. Our cost to file and obtain coverage is $2000.00. This is a one time cost. There is an annual renewal fee estimated to cost $440.00 due in the summer in order to extend the permit coverage into the next year. It is our recommendation that coverage is maintained each year even if treatment is not desired to avoid a repeat filing charge. The application for permitting is first filed through the Department of Ecology secure access system. All components of the treatment sites or possible treatment sites, along with a site review, are submitted to the DOE. A legal notice of intent to treat must be run twice in a local newspaper. During the time between publications, the legal notice must be hand delivered or mailed to all businesses and residents along the shoreline within a quarter mile of the proposed treatment areas. At the end of the second publication of the legal notice a public comment period begins and lasts thirty days. When the public comment period has expired DOE will issue coverage, assuming any valid reasons to deny it. The minimum time between filing the permit and obtaining coverage is 60 days. For all proposed coverage areas of five or more acres, a Discharge Management Plan (DMP) must be developed. This document outlines all characteristics of the water body, as well as all treatment options. This document is developed separately from the above requirements, but must be included when filing for coverage. The costs for the development of the DMP total $500.00. Costs cover time required for developing and submitting this plan. Task 2: Aquatic plant Survey and Reporting AquaTechnex staff will conduct a systematic survey of the permitted area early in the growing season when plant growth is such that proper plant identification is possible. The entire littoral zone of the permitted area will be inspected noting the overall plant community and key components. This is followed by a systematic survey of the plant community using a weed rake. Plant community characteristics will be documented and will include species collected and relative abundance. All gathered information will be incorporated into the survey GIS database. A written report and map will be generated noting identified plant communities and their locations. All agreed upon treatment options will be applied to the survey generating a treatment plan. An end of year survey is conducted as well to assess treatment performance and denote any changes needed to the management program. This methodology includes the minimum required surveying options in order to produce a lawfully abiding and effective treatment plan. Costs for the survey and time necessary to produce the report total $1500.00. Our team has continually upgraded and invested in state of the art Differential Global Positioning System (DGPS) receivers and data loggers. The Trimble GeoXT we currently use allows us to build a data dictionary with the plant species and density information prior to going into the field. It also allows us to upload the aerial imagery and project files from ArcView so we can see and manage our data collection on the water. We can also accurately record the location of the plants as a point, polygon or line and link species and density attributes to those features. The information is then processed into the Trimble Pathfinder software and the software performs differential correction on the data. This provides sub -meter accuracy of the data collected. We can then build shape -files which can be imported directly into ArcView. This allows us to build maps that are extremely accurate very rapidly, which are important in the treatment decision making process. The tools we use minimize costs for labor in terms of building maps and reporting due to their extreme efficiency. Task 3: Distribution of Required Public Notices Before a treatment takes place, two notices must be distributed. These public notices are specific to an upcoming treatment. The first is the Business and Residential notice that is delivered to all businesses and residences along the shoreline within 1/ mile of the treatment area. Notices are delivered 10-42 days before the first treatment of the season takes place. The second notice is posted along the shoreline of the treatment area on the actual day of treatment. This shoreline notice is placed approximately every 100 feet along the shoreline within the treatment area and extends 400 feet outside of the treatment areas. The first notice, the Business and Residential Notice, is distributed once and includes all products and proposed treatment dates for the season. As long the treatments for the season do not deviate from what is in the B&R notice there will be no need to repeat this notification until next year. The shoreline notice will have to be posted for each treatment which may take place. The cost for distributing the Business and Residential notice will be $150.00. The cost for placing the shoreline notice will be $100.00 for each treatment which takes place. Task 4: Treatment Options The following are options provided for the purpose of herbicidal control of invasive species such as Eurasian Water-milfoil, Curly -leaf Pondweed, and Brazilian Elodea: Svstemic Herbicide - Eurasian Water-milfoil For the control of Eurasian Water-milfoil present along the Lake Washington shoreline within the City of Medina we recommend treatment be conducted using a granular formulation of the active ingredient Triclopyr under the product name Renovate OTF. This is a systemic herbicide which has proven very effective in treating milfoil in areas of high water exchange and dilution. This product is absorbed, killing the entire plant including the root crown. Triclopyr is a broad leaf specific herbicide and will target Eurasian Water-milfoil directly not affecting native plant communities. All treated plants will be permanently removed from the system. Due to the nature of Eurasian Water-milfoil and the characteristics of the water body, the risk of re -infestation is high. Future treatments will likely be necessary. Costs for this method of treatment are $3.00/shoreline foot (treatment will extend 150 feet from shore). Contact Herbicide Treatment — Curly -leaf Pondweed and Brazilian Elodea Use of contact herbicides will be highly effective in treating invasive species such as Curly -leaf pondweed and Brazilian Elodea, which are not effected by Triclopyr. Curly -leaf pondweed and Brazilian Elodea are known to inhabit this area of Lake Washington and the permit will allow for a certain percentage of the shoreline (based on the total acreage of the lake) to be treated. We recommend the use of the active ingredient Diquat. There would be a twenty-four hour swim restriction within the treated area associated with this treatment. Costs associated with this treatment are $2. 1 0/shoreline foot (treats 150 feet from shore). Task 5: End -of -year reporting There are two end -of -year reporting duties that AquaTechnex performs. One is to produce a report submitted to the City of Medina summarizing the years tasks completed and the effectiveness of all treatments performed. This report is standard for all AquaTechnex services performed during a given year. The second report is required by the Department of Ecology (DOE) summarizing all herbicidal treatments conducted. Costs associated for both reports total $500.00/treatment year. Table 1: Task Description Cost Coverage under NPDES Develop and file application $2500.00 (Includes coverage permit and DMP for coverage under application and DMP, the NPDES permit development and filing) Visual survey and rake toss (plant species identification Aquatic plant survey and and plant community $1500.00/survey reporting assessment), treatment development, formal report, and GIS map production Business and Residential Hand/mail deliver notices of $150.00 (Printing and labor Notice intent to treat costs) Shoreline Notice Placed along the shoreline on $100.00 (Printing, material, the day of treatment and labor) Renovate OTF Systemic herbicide used to $3.00/shoreline foot (treats treat Eurasian Water-milfoil 150 feet from shore) Reward Contact herbicide used to treat $2.10/shoreline foot (treats exposed vegetation above 150 feet from shore) sediment End of year reporting Required reporting of all $500.00/treatment year treatments conducted within a given year and report to city Permit Renewal Fee Paid in the summer to extend $440.00/year coverage through the next year `Washington State sales tax will be added to all above costs/tasks Adam Harrow Aquatic Specialist AquaTechnex, LLC. Phone: (206) 462-0608 Email: aharrow@gguatechnex.com Web: www.Nuatechnex.com w W It W W li W W IL W W W 10 IL li I j LL l j `ow aw~ Ir aw~ aLU F `o o `ow 0 � w �j0 �$w 28w ��w w w n D:03 QQ cK i5a c om W c� $m 80 25��m of m m m co °owm In C6 C6 to co to In m spy C N i- H DO g p Opp 0p U 0 O p pO O 8S O pOp O O pgj 00 pO O pO co D In 8 m h 00 In O pO S to .n m en � c m $ z' ZO Lu 0 o W p > Z d d d d d m m m m m m s > UCL °a d Q O K c E 'O W O. m m O y 0 O C 0 O 0 ap N a Yl 0 Yl c Cm CIE, O m E OE2m EU E m E m E m g m E > c o > >2C y E`o o o m"E 0 0. 0 0. E f- U W m � O `- a t0 m c C mp C O m C m C a C m C a C po' a 0 'a 'a V V 0' d. c m a` ,N a 12 TI m a W T a � w- 0° a- NT W N c O c 10 ° .-° ° E o a .O > 'c °Zc o a a o> o o ' EL o a m E m U0 Q c aOU-U-U Q U U U U U m O o N m in m a > m m m 0 0 m m 0 m m m m m m11 u0i O m m a0 1 W W pm W W 9m m �m a�g a B° no a m 7 U)O W m a C 7 0� co - 0 m "' V) 7 In (n 7 CO CO F � O I� N W O O u (mV Z r O Ci N O O O O O O o O O w J N Ol C N 13 O w N w Q 0 m w 2 m z w m m w Z s a° a F y U) z in W c Z m z o v! L c O Y N L N rD L L L W Ol Z w 3 w Z w Z w Z o m w Z S m $ 0 w Z w Q. z F g 32 a z a y m O 0 K 0 _ IL W Q T Q _ a c c_ c_ _ V Z>ILI 0 L m l0 a a a mLu Z N O h z-- 2 U.w g W a O L >O > m c 2 m ® m � v m� Q a (CV y W a N a 0) Z d z O Q z -1 z U W W Z Z O z w 2 f - a Z y ►- w < 0 a a U IL IL O m w �° O M a c o m m m w J a0 0 f i° F p W Z w Z 0 w Z a c in N w 2 m y w Z w Z z Q O' w =i Q Q `O N OD Q (O Q Q a 0 H Z T N ZQ a� C ; L_ 9 m O L .D w> m Z N z L t- N z L I- y L Ix O a V w X X xr i b o 0 0 0 0 0 0 0 0 0 to 0) U) N N N N N N N N N N N LL r-n�:m W N m d 10 c0 I� ao °> O O N N N, W O N F 2 !a h — — — pN pN U N N N G T C O «p J W YCID ID m O � W q m C i O Da a m. E m o a� m `O to O o r O a Ean m E a F fi O m W 0 ° F a m O O W a O a w n c a pop oo O. N O C U ° jo, N 8 T d Bm E Occ� o ° a` a O O 8 IW a m j C LL O r C cO3 `m E f -a O ei c C m M m m O p>p m D (D W .° _O yq O a E �mEID ID o- m m • iq 0 n c 0 y) m m 0 H F LL (V cl) O O o °a IL N w c Y< n m o E a '0 3 � O m ° o > us m p0 a 0 q .W O c C W J O m O m° O a U JO000 a > m ro O 0 W � a II 11 II II II O N m d w ( ul z § w $ k 0 z § z zi LU \ 0 a ■ | g § r i § o > / 2 ) _ k CL ) - 2 04 z A § m 3 Tz w \ n > O t0 OD -4 QI Ul ? -1 - -n N N N C j� Of D O O CD 0 06 CA S S y a oo G. D o0 7 CC D) N (wA N O C 7 ci R1 O C)06 O CD O to m m 8� a°• 3 O x 0 c on ov o>> D ov N Gv N CA N 9 N m c0 g 3 tv o= o. � oo N v, O o o. CD to rt O CD .D u) 0 m < O TI CD 0 CO • w 7 CD C cL O C (� N .ZI CD "Z Z v c m `z 3 m v � d o yo c CCD D, o 0 a o' m r i oo a= n o g ee cp 0 coCD i CD cn m v o co < o) ((pp N 0 W fl: CA N N 0 �. n. �• O Q D N 3 S CAD 0 O— N W d .d•. Cc N 0 o on °' 'r -0 v cr cS 42 n D o' D �_ v y o y j y �`py�► F CD �C tomn 0_ QO Cc/) D vim, O O N N N C '0 `�' p n O C n O T a Kcc go (p �' v CD O N C A (0 CL V 'O G. -� O O O Cn (�'pp O CD .-. CD A CD G D p e� c�xpp uDi = 0 -i ��p'�p CD y' �+ 7 T G CA IC p to CD cn N p Er ,�-� CA •• CD O 0 CAN Cn n < O CD y < CD' C (n > CD > C7 D N 0 o c y= TI S D v j a n < CDCD 0 C-i = N 7 i a !n .... CD 7 69 N .�-h Cn ;a tDa C m COD N CD CnCD CD 7 CD 42 o m < ni co CD o' O a � (AN N CC) c� D o N cn 0 D cn CD CD CD o n 3 o C D C V C- 2' D - 7 � m< o o m pO w 0 D cn C) O c O CD :D w O CD 3. Q N N j ca al ca O ry w O iv d N CA O -+ O N ry O p C O' a) � CA 0 l< O .0 N %<< N `< N (D N y N N cn N C1 `�< N O N O S N N CD w (0 (p CQ O � 0 0 0 5' 5' =r cc cc c0 21 D c v CD CD 0 a 0 c w m C a 0 c v 2012 Finance Work Plan City Council Strategic Goals — Finance -(Direct): "Develop and maintain financial policies with the ultimate goal to ensure a sustainable budget whereby ongoing revenues meet ongoing expenditures through revenue source generation, reduction of expenses, or a combination of both." City Council Strategic Goals — (indirect): Management Support & Finance Tracking for all City Departments and City Council in support of Strategic Goals. • Finance Operations: • Daily management of Cash inflows and Cash Outflows through Payroll, Accounts Payable, A/R Invoicing, Cash Receipts & Revenue Tracking o Monthly Reporting: Department Heads, City Council (Internal), Payroll & Benefits filings (External) • Quarterly Reporting: Department Heads, City Council (Internal) and IRS, WA State Quarterly filings (External) • Budgeting, Financial Planning & Analysis: • Current Year Trend Analysis and Forecasting • Department Meetings — identify new programs, sustainment needs and reduction possibilities • Council Priorities- Obtain Council direction early in the process to improve efficiency of budget process • Publish Budget Document • Annual Reporting: • Year End Close Process & Reporting: Department Heads, City Council o IRS filings: Employee W2, Non -Employee 1099 •Annual Report Compliance: ■ Annual filing of Annual Report • Annual Training (SAO, BARS, GASB Reporting Changes) ■ Annual Audit - WA State Auditor's Office • Other- Projects, Ad Hoc, Maintenance: o Revenue Assurance: Hunts Point Contract, Real Estate Excise Tax (REET), Development (Advanced Deposits to Earned Revenue) o WA DOT- Project Reimbursements o Public Records Requests o City Hall: Finalize Invoices and release retainage payments from Escrow o Financial System: Maintenance, Interface to Paladin o Fixed Assets Inventory DEVELOPMENT SERVICES 2012 WORK PLAN A �O M V O N A W N .a c 0 0 o c v d N o C D n = c 7 d ur 0 ni to �< cDi = S S G X M I"w m `< oo " y 3 0. w 3 oN �� o� C) o v Ep 3 fl• 0. D n — C7 v m ea cn m D m 0--- CL X 0 D �i w CD m O a n> 3 > o Cl) C N O 0 m U) .°'� n fD ca N CD C fp O Ci S = �! tv �< 3 C. Vl N N O v Ui to cn X COD D COCD O co fD d CD O n C y "'► �, .+ CD G > p� vi m < a Q -0 0 N O CD O S 7 O tff 7 CD < IQ CO T 7 CD CC. S N w D CD t�A W — (D O to gj � (n N S_ CD (D pt x cDD -n =� C C7 O ••G -n C N ,�, Ot ID -00 7 [De•ffl i•� O 7 P y coO = Q tv fD `� C 3 n C CD ((DD CD -� N COD n _. O 7 CD C!. C O� N y 7 CD a CD N N ? -n y �< CD .a v j L 0 3 3=- 7 O r� o< . n o N rA O v CD d 7 n y-. c 7 CD CD CD a O 3 m a o? `� c a� CD y, < m o w_ p C_� n�i x v � D v? o (� O_ @ eB 0 v Cc < N m 0 X N 0 N O .O-. w ;' w OT Q c O Er D N � ' -n S `< 00 a m s oo CD ` O Co Ci O C=D' °' •c• p� (��pp1 j c CD N o < Cn T OD f11 to o_ �n _.O-. c n CD ,,� S CD ? CD CD (On chi r- m m O < 3 v' CD w 3 O '0 m' �u+l @ y 0 •� CD p o y_ c`Q'D o, d= o m v,' v, CD M 3 o 3 a 3 y O v m ty N o m 3 y �v Co O — c CD rn — — < CD D m N = �. CD 3 CD 3 N 7 C� N ' O< N N O d CD O N .p-. 3 i CD CD : CC] O n O I CD cn d CA 7 C_n N_ CD 0 Q CD T 7 :3.N O O O N S 0 m Pr to v CD m n o D a vi o cn 3 co CD 3 = 0 in =_+ �CD S CD 0 0fn co w N n S 2' CO p N m 0) ti <n W a NCD C Ap z S B fV Z7 c� O < CD Cn CAD CWO N O N O O CD lon O 7 y O A w w= O N — N N 0 01 A ca. N A W W Cn Cn W v c co p N m Q a a N n tD n fy n CU n n d n m n Co n 0)C5 c fl1 0- o. -< N n N Q 0)N C N y 0 CQ cn ,� C N 0 0 N 0 W N cn 0' Cn Cn O p -0 C_ 'p -O 'p p D 3 << a< p p f�D N CD m m N l�D O mN O (Q pOj pOj N N O N (D c O O O S O O S S CD 1 S S S S 1' c C) c r� 1 V/ CD 0 O D Q O c w CD 1 _S 1' a 0 c v Development Services Organizational Chart City Council Strategic Goals — Development Services (Direct): "Manage and monitor that Medina's Comprehensive Plan, building and zoning codes protects the natural suburban environment and the quality and character of the City through processes that are clear and serve both owners and neighbors." "Maximize public awareness and involvement in City business with continuous improvement of communication strategies and industry standards to deliver timely information regarding city services, programs, and events" City Council Strategic Goals — (Indirect): Management of and continuous review and update as appropriate of formal and informal rules and standard operating procedures to ensure department operations align with City Council's strategic goals. Land Use — Comprehensive Plan and Development Regulations: o Complete the state -mandated update to the shoreline master program o Continue comprehensive update to the City's zoning code (placed on hold February 2010 due to shoreline master program update) o Update of the Medina Tree Code o Comprehensive plan amendments for streetscape and the Park Board's park plan goals and policies Development Services Operations: o Daily contacts with the public providing customer service o Daily processing of permits and inspections o Daily management of consultants, including Clyde Hill, to coordinate review services o Regular evaluation of consultant contracts for quality and cost of services o Monthly reporting: Department Heads o Annual building activity reports to state and county agencies • Budgeting, Financial Planning & Analysis: o Monthly monitoring of budget and actual department expenditures and revenues o Continued monitoring and analysis of Fee Schedule to ensure permit fees align with the cost of providing development review and inspection services o Annual participation in budget process • Public Safety: o Code enforcement — primarily construction mitigation • Highway 520: o Daily coordination with eastside and bridge replacement/ maintenance facility teams o Regular response to a variety of issues and resident complaints as work occurs o Issuance of local permits and management of compliance with the conditions of approval • Facilities and Infrastructure: o Process of permits for Independent Tower's wireless communication facility at Fairweather Park 3 0) c CD 'a c a) E 4-' ^' a3 E .o a) C 'ate a) CL � N co X ' M U E E O E U 0 *a-) m E as N ca a) 4" 0 O O� co aJ N 'C\l D ` O Ito cD EO N .O ca CCa U C O -a m -a a) Ca 'O 'C N � CO +� *- CU 0 E 0CL � 0) U cu O 'p CL CD 0 CD > N Ec O C O C a) 0ca� 00 cCD a)o C U O3 .� CV Ss 0 U O > C U N cr 0).C: C ' U __ C +' a) a) 0.= C �70 C O�J� a O a) E XCts ' co E ,N O o � a) p O () a) .. C N a) C OC70 �. d' co CD cN .E c y , . O C .� CO -p �• (tf .4 a) �2(n ` (o a � tU �3(D w Z w 0 ,•• m -pE C CO > CO'= t U � 0 O O '> cts N a cu Cl Ca •� ' C o 0 N cn 0- mo o C) C• 3 3�.• cu N C &0 Q j O +' O () CO U C a) cn O C �H oUUoC�tL Ow o wx(/)if) CL O 2) C �k a) o ca a) Q co E C o a3 a) coQ as .. x (acu cvn.= f.. }. E CD C a) 0) ca ca -0 U .a _ a)a•E�� E .-ca CO)0 ctf �c E � o as U pcl V N ca U a) C _ coO U ,� E p U O CO O (n O U U a) o zD C Cm -E m E �� c m �_ m 2 rn U) Na 2 .� m2 UN NF-0 0-0 r CQ Im.41 lf) CD 1l a0 0) O d O c _0 o c cz o c N O C O U a) � 0 CO cn "C3 = 0 C cu C: U m co L () T L co Q% 0 C) a) O cc Q. N ; c .0 ca Q 0 N O CO O LCD Ll 'O O L- N N cZ Q N N U co N CO ca C a M -0 E A2 a 55 c a) ca a) c a) c v) t� � J C (A c13 O >, co a) 1� Cl)C:)^ }/ N0 C � N X >% -0 C CO : v a) a) '~ O L o m 3 o f E a) 0 0 O E ". O a cu N ()_T 3 m o' a) C:) o co E 0 N a) S w cu U _ C U m� c O E a) c 0 U o �U- c a) E N O — _EW X 0 � M .(� o a) a) �. co a) o a a) E � c (� a E;Q U U ti 00 L ~ a U) r N M � � -p o, O C U U Q Q a-U U U -C CL Q 0- U CD- 0 0 HH 0 H 0 H 0+- a oa H 0 0 _0 � � U =3 (3) C N O � U N co E O C .a 0 •� a ca U) a) Q C N ca N O O C' C ° 0- cc d (a U �' Y (D o E o cca O 0 a 4) a) c _ O CO o �. °' c 2 Co Q CO co O O U ca C 0 p cc `n 5 c c`a Z -C a) U N � c O Z= C E } J 0 s 0 Q a ) � •- a� N x W N c c a ' a)cm N 3 -p cc Q W ca c N > O NU � U c L- U C a) i am O O Co O M Q N O = N lq C: C C +� 0-0) U O (A C 'O N C C N N CO) a m (A CL 'V 0) O O E C C _U N O O CL O n U Q. F- = ao u) ai U s? U U CL CL Q F-F- DEVELOPMENT SERVICES 2012 WORK PLAN City Council Strategic Goals — Development Services (Direct): "Manage and monitor that Medina's Comprehensive Plan, building and zoning codes protects the natural suburban environment and the quality and character of the City through processes that are clear and serve both owners and neighbors." "Maximize public awareness and involvement in City business with continuous improvement of communication strategies and industry standards to deliver timely information regarding city services, programs, and events" City Council Strategic Goals — (Indirect: Management of and continuous review and update as appropriate of formal and informal rules and standard operating procedures to ensure department operations align with City Council's strategic goals. Land Use — Comprehensive Plan and Development Regulations: o Complete the state -mandated update to the shoreline master program o Continue comprehensive update to the City's zoning code (placed on hold February 2010 due to shoreline master program update) o Update of the Medina Tree Code o Comprehensive plan amendments for streetscape and the Park Board's park plan goals and policies Development Services Operations: o Daily contacts with the public providing customer service o Daily processing of permits and inspections o Daily management of consultants, including Clyde Hill, to coordinate review services o Regular evaluation of consultant contracts for quality and cost of services o Monthly reporting: Department Heads o Annual building activity reports to state and county agencies • Budgeting, Financial Planning & Analysis: o Monthly monitoring of budget and actual department expenditures and revenues o Continued monitoring and analysis of Fee Schedule to ensure permit fees align with the cost of providing development review and inspection services o Annual participation in budget process • Public Safety: o Code enforcement — primarily construction mitigation • Highway 520: o Daily coordination with eastside and bridge replacement/ maintenance facility teams o Regular response to a variety of issues and resident complaints as work occurs o Issuance of local permits and management of compliance with the conditions of approval • Facilities and Infrastructure: o Process of permits for Independent Tower's wireless communication facility at Fairweather Park a C7 Ir a O V Z Z J a N •- O N W 0 a IL a •� c _ c m E .�. N Cc$ E 0) N N M X y r O O O co L O co 06 CD a) O N co CX N C U N N 0 Cl) cD ��,�; a LW. ^ 'A v'. •- V C C V O Ctm cii0 ° ':cr N (D � a� � QE N 0) = Oco � p as E 0 C O COO > a)L (3) to ' tv V) > 3 b L p . N :g c � U co � 0 U � � O O � O C -. JLCX.Q ' O Om a)OX 00NUEE Oo0 00- COco) , c� N a) C �= N c O Cl) d, ccf co .O , CO N CQ . CF N tea) co � C (Ci Q. CO O C .� COCD _� O ,U o++>COCLCOCO = Cl) — ocn O- C ° c Co N fn .. t .0 N +• O i j cts .N O a) U.0 C N rrcx Cl) O oC - e`UUmvm.Ucn o omm 5 O a) � . vi OC 0)-p 3: 70 N N c Cl)O �U CL ' M .I N O a) a) N `"fir; ` O E 0 N O �' O O ` O > N a.O O p O O C '+ y � pE. _ U s Eo p dy 0 Q 0 N L ca CX C U (aU U O U O N_ t C Co o U a o C)U O O O 00 C.) oc•�(D E 'a) _a) c c� O E L cam' L U) p O N N F- O U 2 (n D a) N -a O 2 O N CO 2 .cam .• O 2y: � � cQ 6 � CO � 00 � d O r: c -0 o c c ca O ca O rn C_ a E O U a O m C � a O c O °� c as rU Cn a) T a) its O () O CO NCL i a) a) Cb a_O E CO N O a)cz -0 O l L a) _(D Q -a a) � cz co a > a) N U) -0 () U) O C d CU a) E � a)'a as c j � (D cu co cu o >, Cl)a) T Cl) •a O -C :3 N OC N X -p C � a) "- o U a) .0 cn a O - E O O O E 0 O Q cz N N ate) T o c co E O N a) c O co 3 O � U = _a) .0co a) CO I--- -0 � CD a c U E °' O � X X o :5W c a) E O c r� - _EW X a) a o .c aa)) E N co I o � 0 m ? m v Q -0 = 5 (D CD a U c E W_c cn O o F- n. IL() U T CV CO Lo O C U C� U U U U ca n. a a- Q. a a s O O 0 0 0= O Q F- F- F- F- F- a. F- a 0 • • 0 0 0 U c O _O t13 -C U O � C N C O +. U U ca a) ca Q O E •" O +' 3 c co Q 0 Q c 0 ca a) = a) O o- 0 ca W IL 0CL (D cc E o co O 0 a a) c ZO�o. o _o _CIS N CO) g n Co o V o U) a) ` o .� co Z .c oCD4- 0 CIS 0) Z Q co 3 0 a) a) J o O � IL o rn •= a) N x W N O O N 3 'a .0 co p W ca c 0 m 0 a) U O »= aD m IL -ca Q as Uc c(D �0 0, co � c L •_� o o a) m C N O ' C (n Q .0 O E c .0 5 Y c.)a) �� Uca o = 60 co of CL Q. U Q Critical Areas The state guidelines require shoreline critical areas regulations to provide at least equal protection as Chapter 18.12 MMC, plus they must provide a level of protection to ensure no net loss of ecological functions. The current proposal simply takes the City's existing critical areas regulations, cleans them up, and drops them into the draft. Clean-up included removing provisions that conflict with the Shoreline Management Act and state guidelines such as the provisions for Reasonable Use Exceptions (exceptions can only be granted by a shoreline variance process). 5 What is the same? • 16-foot height limit • 12-foot side yard setback • Use of a triangle building envelope Shoreline stabilization (e.g. bulkheads) What is new? • Just about everything — based on WAC 173-26 o For new structures —geotechnical justification is required o Replacement structures must demonstrate need (not required to be geotechnical based) o Preference for soft stabilization measures over hard structure • Requirements for replacement structures • Establish repair threshold standard • Mitigation requirements for new hard structures and additions to hard structures What is the same? • Remain a permitted use • Prohibition on extending waterward of the ordinary high water line General shoreline regulations These are general requirements applicable to all new development. What is new? • No net loss analysis and mitigation sequencing • Criteria for public access requirements • New nonconforming structure protections for existing patios and decks • Lighting requirements • Clarification for in -water construction requirements What is the same? • Tree removal and replacement requirements o Clarification added for dead trees and significant pruning actions • Vegetation conservation within 50 feet of the shoreline • Surface water/ water quality requirements o Found in the stormwater regulations in Chapter 13.06 • Except as noted above, the treatment of nonconforming development • Provisions for emergency actions (currently found in state law) 0 * =.z CITY OF MEDINA 501 Evergreen Point Road, Medina WA 98039 425.233.6400 (phone) 425.451.8197 (fax) www.medina-wa.aov MEMORANDUM To: PLANNING COMMISSION From ROBERT J. GRUMBACH, AICP Date: FEBRUARY 28, 2012 Subject: Executive Summary Draft Shoreline Master Program Update The City is required to conduct a comprehensive update of its shoreline master program to be consistent with the 2003 Shoreline Master Program Guidelines set forth in WAC 173-26. The shoreline master program acts as an overlay and is applied in conjunction with other development regulations, including zoning, stormwater, and the tree code. The draft document updating the shoreline master program is based upon and incorporates provisions that recognize existing shoreline development and ecological functions, priorities of Medina shoreline homeowners, and established policies and measures intended to avoid further degradation of key shoreline ecological functions. The following is an overview of what in the draft proposal is new and what is the same. No net loss One of the governing principles required with the update is for the regulations to achieve no net loss of ecological functions (WAC 173-26-186(8)). Simply stated, "no net loss" is designed to halt the introduction of new impacts to the shoreline environment resulting from new development that is authorized by the shoreline master program. Overall, it's a program that measures key indicators to determine if a decline in ecological functions is occurring due to new development. Individually, it's proportional mitigation for impacts caused by new development. What is new? The draft updating the shoreline master program contains throughout the policies and regulations new measures and standards that are intended to avoid further loss of ecological functions. In those situations where specific standards are not called out, analysis to determine proper mitigation measures is used to avoid further loss of ecological functions. What is the same? While shoreline master programs have always incorporated requirements for protecting natural elements of the shoreline environment, the application of a "no net loss" principle is new. Shoreline environment designations What is new? • Aquatic (Lake Washington) • Transportation (SR 520) • Three private community tracts changed from Residential to Urban Conservancy What is the same? • Residential (name change from Urban) • Urban Conservancy (name change from Recreational Conservancy) Shoreline setbacks The City's, shoreline setbacks are found in Chapter 17.38 MMC. They serve not only to protect ecological functions, but preserve Medina's low -density residential shoreline character. What is new? • The 30-foot setback area has been divided into the following setback scheme: 0 30-foot setback with enhancements 0 30-foot setback with enhancements/ 50-foot setback without enhancements 0 30 to 50-foot stringline setback without enhancements • The method for establishing the stringline was simplified • Setback intrusions are identified and spelled -out What is the same? • 50-foot setback without enhancements • 70 to 125-foot stringline setback without enhancements Other shoreline lot and bulk standards These are the standards that establish parameters on the development capacity of a piece of land. What is new? • Minimum water frontage and lot width requirements o Applied only to new divisions of land and lot line adjustments o Does not create new nonconformity • Maximum shoreline height requirements (zoning height standards usually are more restrictive) What is the same? • Minimum lot sizes • Maximum impervious surface standards • Zoning standards not included in the shoreline master program (structural coverage, setbacks, height, bonuses etc) K: Piers and docks Nearly all of Medina's shoreline is built out. There are 186 piers and docks in Medina ranging in size from 332 square feet of water surface area to 5,357 square feet of water surface area. What is new? • Expanded to allow one pier/ dock per lot instead of one per ownership • Allow pier/ dock to be located off -site • New dimensional and design standards with four potential approaches: o New — based on RGP-3 (Corps of Engineer) standards and is applicable to lots currently without piers or docks o Existing — based on existing conditions with certain reductions to support no net loss and is applicable to lots currently with piers or docks o Alternative — based on Federal or State approved design and is applicable to any lot o Nonconforming — ok with what you have, but cannot abandon or increase nonconformity • Specific new dimensional and material standards o Limits on overwater coverage o Limits on walkway width o Dimensional standards for ells and fingers on new piers and docks o Minimum waterward distances for structures • Clarification on method to measure pier/ dock length • Mitigation requirements for new piers/ docks and new additions • New threshold standards for modifications, and for repair and maintenance o Additional nonconforming structure protections for changes that improve the shoreline environment What is the same? • 100-foot maximum length for piers/ docks • 12-foot side yard setbacks • Pile heights • Allowances for skirting • Prohibition on walls and sheathing and lockers Covered moorage and boatlifts What is new? • Limit of three boatlifts per dwelling (includes lifts for jet skis) • Changed overwater coverage from 25% of moorage envelope to a fixed maximum of 500 square feet (750 square feet for shared) • Method for establishing moorage triangle has been modified • 30-foot waterward setback for structures • Deleted 16-inch vertical roof dimension • Changed materials from non -reflective to translucent 3